IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

320

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0002 # 03 Y:2007 03 2007 OPTIMIZE PLANT POWER FACTOR $3,500 $8,000 Not Implemented
TT0002 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $612 $1,318 Not Implemented
TT0002 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,680 $16,138 Not Implemented
TT0002 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,171 $150,176 Not Implemented
TT0002 # 07 Y:2007 07 2007 RECOVER WASTE HEAT FROM EQUIPMENT $17,296 $3,500 Not Implemented
TT0002 # 08 Y:2007 08 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,553 $14,000 Implemented
TT0002 # 09 Y:2007 09 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,324 $1,400 Implemented
TN0693 # 01 Y:2000 01 2000 MODIFY CURRENT INCENTIVE PROGRAM $77,500 $35,600 Not Implemented
TN0693 # 02 Y:2000 02 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $69,815 $1,200 Implemented
TN0693 # 03 Y:2000 03 2000 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $22,100 $8,120 Implemented
TN0693 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,000 $35,070 Implemented
TN0693 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,176 $379 Not Implemented
TN0693 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,508 $18,900 Not Implemented
TN0693 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,503 $900 Not Implemented
TN0693 # 08 Y:2000 08 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,357 $490 Implemented
TN0693 # 09 Y:2000 09 2000 RECOVER AND REUSE WASTE MATERIAL $750 $570 Not Implemented
TN0630 # 01 Y:1998 01 1998 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $15,740 $48,585 Not Implemented
TN0630 # 02 Y:1998 02 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $59,380 $17,000 Not Implemented
TN0630 # 03 Y:1998 03 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,800 $5,900 Implemented
TN0630 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,580 $3,185 Not Implemented
TN0630 # 05 Y:1998 05 1998 INSTALL TIMERS AND/OR THERMOSTATS $300 $485 Not Implemented
TN0629 # 01 Y:1998 01 1998 REDUCE SCRAP PRODUCTION $62,560 $5,700 Implemented
TN0629 # 02 Y:1998 02 1998 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $35,290 $98,000 Not Implemented
TN0629 # 03 Y:1998 03 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $24,360 $9,800 Not Implemented
TN0629 # 04 Y:1998 04 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $21,285 $25,800 Implemented