IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

547

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0520 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $410 $670 Not Implemented
KU0520 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $250 $250 Implemented
KU0520 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $210 $350 Implemented
KU0520 # 06 Y:1999 06 1999 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $3,440 $3,630 Implemented
KU0520 # 07 Y:1999 07 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $6,720 $8,000 Implemented
KU0520 # 08 Y:1999 08 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $4,320 $9,500 Not Implemented
KU0515 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $400,000 $602,110 Implemented
KU0515 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,780 $400 Implemented
KU0515 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,660 $2,430 Not Implemented
KU0515 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $820 $2,540 Not Implemented
KU0515 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $530 $0 Implemented
KU0515 # 05 Y:1999 05 1999 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $3,140 $7,830 Implemented
KU0509 # 01 Y:1998 01 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,070 $0 Implemented
KU0509 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $640 $380 Implemented
KU0509 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $430 $190 Not Implemented
KU0509 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $400 $530 Not Implemented
KU0509 # 05 Y:1998 05 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $330 $380 Not Implemented
KU0509 # 06 Y:1998 06 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,630 $1,170 Implemented
KU0509 # 07 Y:1998 07 1998 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $2,330 $4,200 Not Implemented
KU0509 # 08 Y:1998 08 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $10,600 $13,800 Not Implemented
KU0509 # 09 Y:1998 09 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,350 $30 Implemented
KU0497 # 01 Y:1998 01 1998 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $5,550 $12,730 Not Implemented
KU0497 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,050 $7,880 Implemented
KU0497 # 03 Y:1998 03 1998 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,080 $0 Implemented
KU0497 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $840 $1,050 Implemented