IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

456

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0263 # 04 Y:2003 04 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $47,210 $100,000 Implemented
NC0263 # 05 Y:2003 05 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $8,768 $10,000 Not Implemented
NC0263 # 06 Y:2003 06 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $46,271 $135,400 Not Implemented
NC0263 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $556 $680 Implemented
NC0263 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $413 $240 Implemented
NC0237 # 01 Y:2002 01 2002 RECYCLE WHITE WATER $6,970 $3,500 Implemented
NC0237 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,443 $680 Implemented
NC0237 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,935 $3,000 Not Implemented
NC0237 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,825 $500 Not Implemented
NC0216 # 01 Y:2001 01 2001 AVOID REWINDING MOTORS MORE THAN TWICE $902 $662 Implemented
NC0216 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,475 $1,464 Not Implemented
NC0216 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $608 Not Implemented
NC0216 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $1,799 $549 Implemented
NC0216 # 05 Y:2001 05 2001 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $9,998 $40,000 Implemented
NC0216 # 06 Y:2001 06 2001 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $50,246 $30,000 Not Implemented
NC0216 # 07 Y:2001 07 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $130,124 $27,500 Not Implemented
NC0199 # 01 Y:2000 01 2000 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,845 $777 Not Implemented
NC0199 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,374 $7,490 Implemented
NC0199 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,516 $1,070 Not Implemented
NC0199 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $351 $102 Not Implemented
NC0199 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,352 $210 Implemented
NC0199 # 06 Y:2000 06 2000 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,140 $0 Implemented
NC0199 # 07 Y:2000 07 2000 INSTALL COMMON HEADER ON COMPRESSORS $26,946 $118,000 Not Implemented
TN0694 # 01 Y:2000 01 2000 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $219,860 $100,000 Not Implemented
TN0694 # 02 Y:2000 02 2000 ADD AREA LIGHTING SWITCHES $17,510 $25,030 Implemented