Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
551
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0340 # 02 Y:2023 | 02 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,688 | $320 | Implemented |
MZ0340 # 05 Y:2023 | 05 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,940 | $4,520 | Not Implemented |
MZ0340 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $188,061 | $900,000 | Not Implemented |
MZ0340 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $618 | $260 | Implemented |
MZ0340 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $27,810 | $3,202 | Not Implemented |
MZ0340 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,531 | $5,336 | Implemented |
MZ0340 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,529 | $720 | Implemented |
MZ0340 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,084 | $18,000 | Not Implemented |
MZ0326 # 02 Y:2022 | 02 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,611 | $4,700 | Not Implemented |
MZ0326 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,449 | $3,200 | Implemented |
MZ0326 # 12 Y:2022 | 12 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,151 | $600 | Not Implemented |
MZ0326 # 11 Y:2022 | 11 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $384,733 | $2,868,753 | Implemented |
MZ0326 # 06 Y:2022 | 06 | 2022 | OPTIMIZE PLANT POWER FACTOR | $1,106 | $2,244 | Implemented |
MZ0326 # 07 Y:2022 | 07 | 2022 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $597 | $580 | Implemented |
MZ0326 # 10 Y:2022 | 10 | 2022 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,954 | $1,170 | Not Implemented |
MZ0326 # 03 Y:2022 | 03 | 2022 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,085 | $144 | Implemented |
MZ0326 # 08 Y:2022 | 08 | 2022 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $116,541 | $552,315 | Not Implemented |
MZ0326 # 04 Y:2022 | 04 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $874 | $140 | Not Implemented |
MZ0326 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,930 | $12,076 | Implemented |
MZ0326 # 09 Y:2022 | 09 | 2022 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $10,442 | $18,650 | Not Implemented |
MZ0315 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,771 | $14,420 | Implemented |
MZ0315 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,247 | $250 | Implemented |
MZ0315 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,404 | $480 | Implemented |
MZ0315 # 01 Y:2022 | 01 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $15,635 | $15,360 | Not Implemented |
MZ0315 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $3,818 | $360 | Implemented |