Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
572
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0378 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,972 | $3,500 | n/a |
MZ0378 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $196,374 | $1,560,000 | n/a |
MZ0378 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,844 | $12,060 | n/a |
MZ0378 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $4,373 | $750 | n/a |
MZ0378 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,470 | $750 | n/a |
MZ0378 # 02 Y:2025 | 02 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $26,585 | $49,000 | n/a |
MZ0374 # 02 Y:2025 | 02 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,818 | $13,380 | n/a |
MZ0374 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,683 | $8,662 | n/a |
MZ0374 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,642 | $3,212 | n/a |
MZ0374 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $165 | $415 | n/a |
MZ0374 # 05 Y:2025 | 05 | 2025 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,884 | $4,020 | n/a |
MZ0374 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,170 | $7,950 | n/a |
MZ0361 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,784 | $1,000 | Implemented |
MZ0361 # 03 Y:2024 | 03 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,797 | $4,800 | Not Implemented |
MZ0361 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,633 | $6,555 | Implemented |
MZ0361 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,882 | $33,744 | Implemented |
MZ0361 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $322,316 | $3,602,500 | Not Implemented |
MZ0361 # 06 Y:2024 | 06 | 2024 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $45,827 | $6,720 | Not Implemented |
MZ0361 # 08 Y:2024 | 08 | 2024 | MINIMIZE WATER USAGE | $71,580 | $385,388 | Not Implemented |
MZ0361 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $2,158 | $1,750 | Implemented |
MZ0361 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,374 | $117,036 | Implemented |
MZ0340 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,531 | $5,336 | Implemented |
MZ0340 # 02 Y:2023 | 02 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,688 | $320 | Implemented |
MZ0340 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $618 | $260 | Implemented |
MZ0340 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,084 | $18,000 | Not Implemented |