Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
556
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0019 # 06 Y:2001 | 06 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $161 | $140 | Not Implemented |
TA0019 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $1,015 | $346 | Implemented |
TA0019 # 01 Y:2001 | 01 | 2001 | INSTALL AUTOMATIC PACKING EQUIPMENT | $27,478 | $2,805 | Not Implemented |
TA0019 # 04 Y:2001 | 04 | 2001 | USE EVAPORATION TO CONCENTRATE MATERIAL | $5,184 | $5,331 | Implemented |
TA0019 # 02 Y:2001 | 02 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,836 | $225 | Implemented |
TA0019 # 03 Y:2001 | 03 | 2001 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,994 | $3,000 | Not Implemented |
SU0123 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $739 | $0 | Implemented |
SU0123 # 01 Y:2001 | 01 | 2001 | ELIMINATE SHIFT | $13,517 | $0 | Not Implemented |
SU0123 # 08 Y:2001 | 08 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $42 | $3 | Implemented |
SU0123 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,325 | $7,060 | Implemented |
SU0123 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $347 | $117 | Implemented |
SU0123 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,968 | $694 | Implemented |
SU0123 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $378 | $196 | Implemented |
SU0123 # 04 Y:2001 | 04 | 2001 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $1,800 | $0 | Implemented |
CO0498 # 03 Y:2001 | 03 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,110 | $7,530 | Not Implemented |
CO0498 # 01 Y:2001 | 01 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,880 | $7,000 | Not Implemented |
CO0498 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $410 | $0 | Implemented |
CO0498 # 02 Y:2001 | 02 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,910 | $5,800 | Implemented |
CO0498 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $380 | $210 | Implemented |
CO0498 # 06 Y:2001 | 06 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $71,500 | $3,200 | Implemented |
SU0120 # 04 Y:2001 | 04 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $160 | $840 | Not Implemented |
SU0120 # 07 Y:2001 | 07 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $12,567 | $20,000 | Not Implemented |
SU0120 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $188 | $30 | Not Implemented |
SU0120 # 06 Y:2001 | 06 | 2001 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $21,289 | $75,000 | Not Implemented |
SU0120 # 01 Y:2001 | 01 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,106 | $0 | Implemented |