IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

556

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0019 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $1,015 $346 Implemented
TA0019 # 01 Y:2001 01 2001 $27,478 $2,805 Not Implemented
TA0019 # 02 Y:2001 02 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,836 $225 Implemented
TA0019 # 04 Y:2001 04 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $5,184 $5,331 Implemented
TA0019 # 03 Y:2001 03 2001 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,994 $3,000 Not Implemented
TA0019 # 06 Y:2001 06 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $161 $140 Not Implemented
SU0123 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,968 $694 Implemented
SU0123 # 08 Y:2001 08 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $42 $3 Implemented
SU0123 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $378 $196 Implemented
SU0123 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $739 $0 Implemented
SU0123 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $347 $117 Implemented
SU0123 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,325 $7,060 Implemented
SU0123 # 04 Y:2001 04 2001 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,800 $0 Implemented
SU0123 # 01 Y:2001 01 2001 $13,517 $0 Not Implemented
CO0498 # 02 Y:2001 02 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,910 $5,800 Implemented
CO0498 # 06 Y:2001 06 2001 $71,500 $3,200 Implemented
CO0498 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,880 $7,000 Not Implemented
CO0498 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,110 $7,530 Not Implemented
CO0498 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $380 $210 Implemented
CO0498 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $410 $0 Implemented
SU0120 # 06 Y:2001 06 2001 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $21,289 $75,000 Not Implemented
SU0120 # 01 Y:2001 01 2001 $1,106 $0 Implemented
SU0120 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $2,537 $8,750 Not Implemented
SU0120 # 04 Y:2001 04 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $160 $840 Not Implemented
SU0120 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,600 $0 Not Implemented