Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
221
matching recommendationsSIC | 3511 | Turbines And Turbine Generator Sets |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0851 # 08 Y:2022 | 08 | 2022 | USE PHOTOCELL CONTROLS | $120 | $261 | Not Implemented |
AM0851 # 07 Y:2022 | 07 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $580 | $40 | Not Implemented |
AM0851 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $348 | $750 | Not Implemented |
OK1070 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,014 | $990 | Implemented |
OK1070 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,761 | $4,884 | Not Implemented |
OK1070 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,927 | $3,985 | Not Implemented |
OK1070 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,329 | $0 | Implemented |
OK1070 # 08 Y:2022 | 08 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,533 | $440 | Not Implemented |
OK1070 # 04 Y:2022 | 04 | 2022 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $3,689 | $3,294 | Not Implemented |
OK1070 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $2,659 | $8,954 | Implemented |
OK1070 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $2,809 | $9,600 | Not Implemented |
LE0479 # 08 Y:2019 | 08 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,624 | $75,000 | Not Implemented |
LE0479 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,667 | $6,000 | Not Implemented |
LE0479 # 03 Y:2019 | 03 | 2019 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $20,437 | $22,500 | Not Implemented |
LE0479 # 05 Y:2019 | 05 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,469 | $3,500 | Not Implemented |
LE0479 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,351 | $15,513 | Implemented |
LE0479 # 06 Y:2019 | 06 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $34 | $105 | Not Implemented |
LE0479 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $339 | $310 | Not Implemented |
LE0479 # 02 Y:2019 | 02 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,431 | $9,000 | Not Implemented |
OK0965 # 10 Y:2017 | 10 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,351 | $0 | Implemented |
OK0965 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $918 | $3,250 | Implemented |
OK0965 # 09 Y:2017 | 09 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $159 | $0 | Not Implemented |
OK0965 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $858 | $4,081 | Implemented |
OK0965 # 04 Y:2017 | 04 | 2017 | USE PHOTOCELL CONTROLS | $765 | $3,975 | Implemented |
OK0965 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,787 | $55,459 | Implemented |