IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,293

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0168 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $339 $318 Implemented
BD0168 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $258 $400 Implemented
BD0168 # 08 Y:2000 08 2000 USE SYNTHETIC LUBRICANT $216 $500 Implemented
BD0168 # 09 Y:2000 09 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $8,439 $32,000 Implemented
BD0168 # 10 Y:2000 10 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,751 $3,000 Implemented
BD0168 # 11 Y:2000 11 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,048 $100 Implemented
BD0168 # 12 Y:2000 12 2000 MINIMIZE WATER USAGE $490 $1,000 Implemented
BD0168 # 13 Y:2000 13 2000 SELL USED PLATES TO AN ALUMINUM RECYCLER $224 $400 Implemented
BD0168 # 14 Y:2000 14 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $2,823 $6,000 Implemented
BD0168 # 15 Y:2000 15 2000 PAY BILLS ON TIME TO AVOID LATE FEES $1,013 $0 Implemented
ND0360 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,566 $560 Implemented
ND0360 # 07 Y:2000 07 2000 USE OPTIMUM TEMPERATURE $86 $20 Implemented
OK0601 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $684 $3,500 Implemented
OK0601 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $17,881 $5,000 Implemented
OK0601 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $14,040 $35,000 Implemented
AM0377 # 01 Y:2000 01 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $27,190 $0 Implemented
AM0377 # 02 Y:2000 02 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $11,500 $6,100 Implemented
AM0377 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,870 $500 Implemented
AM0377 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $450 $110 Implemented
AM0377 # 06 Y:2000 06 2000 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $320 $0 Implemented
AM0377 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $230 $0 Implemented
AM0376 # 08 Y:2000 08 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $600 $1,030 Implemented
AM0376 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,410 $3,340 Implemented
AM0376 # 05 Y:2000 05 2000 ADD AREA LIGHTING SWITCHES $950 $640 Implemented
AM0376 # 06 Y:2000 06 2000 USE PHOTOCELL CONTROLS $730 $605 Implemented