IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0187 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $922 Implemented
IA0187 # 01 Y:1997 01 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,822 $1,825 Implemented
IA0187 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $140 $170 Implemented
IA0187 # 09 Y:1997 09 1997 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $3,368 $1,054 Implemented
IA0187 # 08 Y:1997 08 1997 CONVERT TO ELECTROSTATIC POWDER COATING $12,006 $7,800 Implemented
IA0187 # 06 Y:1997 06 1997 INSTALL TIMERS AND/OR THERMOSTATS $361 $384 Implemented
OK0534 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,249 $124,654 Implemented
OK0534 # 13 Y:1997 13 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $858 $0 Implemented
OK0534 # 08 Y:1997 08 1997 RECOVER WASTE HEAT FROM EQUIPMENT $3,814 $732 Implemented
OK0534 # 07 Y:1997 07 1997 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $5,196 $1,000 Implemented
OK0534 # 06 Y:1997 06 1997 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $5,542 $27,375 Implemented
OK0534 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,484 $18,600 Implemented
OK0534 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $128,530 $202,500 Implemented
OK0534 # 01 Y:1997 01 1997 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $285,720 $575,000 Implemented
MO0209 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,289 $1,942 Implemented
IA0167 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $263 $500 Implemented
IA0167 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $775 $204 Implemented
IA0167 # 02 Y:1997 02 1997 $20,790 $71,000 Implemented
IA0167 # 01 Y:1997 01 1997 CONVERT TO ELECTROSTATIC POWDER COATING $111,000 $7,800 Implemented
KU0473 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $3,480 Implemented
KU0473 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $450 Implemented
KU0473 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $220 $100 Implemented
KU0473 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $360 Implemented
KU0473 # 06 Y:1997 06 1997 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $390 $110 Implemented
CO0385 # 05 Y:1997 05 1997 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $6,410 $13,700 Implemented