IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,768

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0379 # 14 Y:2008 14 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,500 $2,050 Implemented
WV0379 # 15 Y:2008 15 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $700 $1,125 Implemented
AM0550 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $110,000 $84,000 Not Implemented
AM0550 # 02 Y:2008 02 2008 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $50,000 $252,000 Not Implemented
AM0550 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,260 $0 Implemented
AM0550 # 04 Y:2008 04 2008 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $14,250 $220 Not Implemented
AM0550 # 05 Y:2008 05 2008 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,130 $0 Not Implemented
AM0550 # 06 Y:2008 06 2008 RECOVER AND REUSE COOLING WATER $4,850 $27,325 Not Implemented
AM0550 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,925 $700 Implemented
AM0550 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $1,800 $640 Implemented
AM0550 # 09 Y:2008 09 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,130 $500 Implemented
AM0550 # 10 Y:2008 10 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $450 $1,260 Not Implemented
AM0549 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $72,200 $85,400 Implemented
AM0549 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,300 $1,000 Implemented
AM0549 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $80,000 $0 Not Implemented
AM0549 # 04 Y:2008 04 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,050 $0 Implemented
AM0549 # 05 Y:2008 05 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,260 $615 Implemented
AM0549 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,220 $1,410 Implemented
AM0549 # 07 Y:2008 07 2008 INSTALL SKYLIGHTS $1,110 $1,410 Not Implemented
AM0549 # 08 Y:2008 08 2008 USE SYNTHETIC LUBRICANT $560 $0 Not Implemented
MZ0008 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,856 $21,050 Implemented
MZ0008 # 02 Y:2007 02 2007 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $44,772 $6,399 Implemented
MZ0008 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,289 $800 Implemented
MZ0008 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $694 $1,300 Implemented
MZ0008 # 05 Y:2007 05 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $812 $0 Implemented