IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0457 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,926 $7,711 Implemented
NC0457 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $415 $525 Implemented
NC0457 # 03 Y:2012 03 2012 LOWER CEILING TO REDUCE CONDITIONED SPACE $19,472 $40,000 Not Implemented
NC0457 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $508 $400 Implemented
NC0457 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,516 $0 Implemented
NC0457 # 06 Y:2012 06 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,161 $2,000 Not Implemented
NC0396 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,690 $5,306 Not Implemented
NC0396 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,507 $0 Not Implemented
NC0396 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $313 $132 Not Implemented
NC0396 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $600 $558 Not Implemented
NC0396 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,090 $83,137 Not Implemented
NC0396 # 02 Y:2009 02 2009 CONDENSE OPERATION INTO ONE BUILDING $31,185 $13,100 Not Implemented
NC0396 # 01 Y:2009 01 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $76,612 $275,318 Not Implemented
NC0380 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $9,853 $4,500 Not Implemented
NC0380 # 08 Y:2008 08 2008 DEVELOP A REPAIR/REPLACE POLICY $1,283 $1,540 Implemented
NC0380 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $138 $980 Not Implemented
NC0380 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,126 $91,580 Not Implemented
NC0380 # 05 Y:2008 05 2008 IMPROVE SPACE COMFORT CONDITIONING $89,762 $37,500 Not Implemented
NC0380 # 04 Y:2008 04 2008 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $168,000 $120,000 Not Implemented
NC0380 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $864 $100 Implemented
NC0380 # 01 Y:2008 01 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $8,150 $8,000 Not Implemented
NC0170 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,515 $0 Implemented
NC0170 # 02 Y:1999 02 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,345 $500 Not Implemented
NC0170 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,462 $2,000 Implemented
NC0170 # 04 Y:1999 04 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,763 $200 Not Implemented