IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

823

matching recommendations
Reset
SIC 3531 Construction Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0016 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,222 $600 n/a
BD0016 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,583 $3,000 n/a
BD0016 # 04 Y:1995 04 1995 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,362 $5,900 n/a
TN0515 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,200 $3,740 Not Implemented
TN0515 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,074 $1,300 Implemented
TN0515 # 03 Y:1994 03 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $5,662 $0 Implemented
TN0515 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,397 $600 Implemented
TN0515 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,167 $1,280 Not Implemented
TN0515 # 06 Y:1994 06 1994 USE DEMAND CONTROLLER OR LOAD SHEDDER $102,600 $20,800 Not Implemented
BD0005 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,475 $22,315 Implemented
BD0005 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,194 $4,456 Implemented
BD0005 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $1,322 $150 Implemented
BD0005 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,870 $3,200 Implemented
BD0005 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,894 $1,000 Implemented
BD0005 # 06 Y:1994 06 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $41,565 $17,500 Not Implemented
BD0005 # 07 Y:1994 07 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,035 $6,000 Not Implemented
BD0005 # 08 Y:1994 08 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,657 $62,000 Not Implemented
OK0420 # 01 Y:1993 01 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,284 $10,500 Not Implemented
OK0420 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,406 $5,658 Implemented
OK0420 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $390 $1,000 Not Implemented
OK0420 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $559 Implemented
KU0397 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,945 $3,615 Implemented
KU0397 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $800 $4,524 Implemented
UF0042 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,115 $304 Not Implemented
UF0042 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $8,070 $7,350 Not Implemented