Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
297
matching recommendationsSIC | 3533 | Oil And Gas Field Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0601 # 04 Y:2000 | 04 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $140,000 | $100,000 | Not Implemented |
OK0601 # 05 Y:2000 | 05 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $29,952 | $0 | Not Implemented |
OK0601 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $14,040 | $35,000 | Implemented |
OK0601 # 07 Y:2000 | 07 | 2000 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $5,829 | $0 | Not Implemented |
AM0377 # 01 Y:2000 | 01 | 2000 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $27,190 | $0 | Implemented |
AM0377 # 02 Y:2000 | 02 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $11,500 | $6,100 | Implemented |
AM0377 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,870 | $500 | Implemented |
AM0377 # 04 Y:2000 | 04 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $900 | $1,000 | Not Implemented |
AM0377 # 05 Y:2000 | 05 | 2000 | INSTALL OCCUPANCY SENSORS | $450 | $110 | Implemented |
AM0377 # 06 Y:2000 | 06 | 2000 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $320 | $0 | Implemented |
AM0377 # 07 Y:2000 | 07 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $230 | $0 | Implemented |
AM0376 # 01 Y:2000 | 01 | 2000 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $77,809 | $157,500 | Not Implemented |
AM0376 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,313 | $32,300 | Not Implemented |
AM0376 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,410 | $3,340 | Implemented |
AM0376 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,250 | $0 | Not Implemented |
AM0376 # 05 Y:2000 | 05 | 2000 | ADD AREA LIGHTING SWITCHES | $950 | $640 | Implemented |
AM0376 # 06 Y:2000 | 06 | 2000 | USE PHOTOCELL CONTROLS | $730 | $605 | Implemented |
AM0376 # 07 Y:2000 | 07 | 2000 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $700 | $350 | Implemented |
AM0376 # 08 Y:2000 | 08 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $600 | $1,030 | Implemented |
AM0355 # 01 Y:1999 | 01 | 1999 | MODIFY STARTUP/SHUTDOWN TIMES | $25,130 | $0 | Implemented |
AM0355 # 02 Y:1999 | 02 | 1999 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $5,910 | $150 | Not Implemented |
AM0355 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,285 | $1,400 | Implemented |
AM0355 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,300 | $500 | Implemented |
AM0355 # 05 Y:1999 | 05 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $570 | $150 | Implemented |
AM0355 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $540 | $600 | Not Implemented |