IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

349

matching recommendations
Reset
SIC 3535 Conveyors And Conveying Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0575 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $940 $70 Implemented
WV0575 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $715 $1,275 Not Implemented
WV0575 # 07 Y:2019 07 2019 RECYCLE WHITE WATER $674 $2,000 Not Implemented
WV0575 # 08 Y:2019 08 2019 DEVELOP A REPAIR/REPLACE POLICY $576 $558 Implemented
DL0110 # 02 Y:2013 02 2013 INSTALL TIMERS AND/OR THERMOSTATS $6,320 $260 Implemented
DL0110 # 01 Y:2013 01 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,313 $39,750 Not Implemented
DL0110 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $10,321 $35,000 Not Implemented
DL0110 # 04 Y:2013 04 2013 REDUCE VENTILATION AIR $4,577 $102 Not Implemented
DL0110 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,720 $24,800 Not Implemented
DL0110 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,991 $152 Not Implemented
DL0110 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,943 $644 Not Implemented
LE0351 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $5,155 $7,480 Implemented
LE0351 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,503 $240 Not Implemented
LE0351 # 04 Y:2013 04 2013 UPGRADE OBSOLETE EQUIPMENT $3,863 $10,000 Implemented
LE0351 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,220 $6,540 Implemented
LE0351 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,415 $4,700 Not Implemented
UA0087 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $2,185 $217 Not Implemented
UA0087 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,878 $1,875 Not Implemented
UA0087 # 05 Y:2012 05 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,599 $3,290 Not Implemented
UA0087 # 04 Y:2012 04 2012 INSTALL TIMERS AND/OR THERMOSTATS $10,082 $1,700 Implemented
UA0087 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,286 $1,843 Not Implemented
UA0087 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,463 $2,000 Implemented
UA0087 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,153 $960 Not Implemented
TT0070 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,235 $0 Not Implemented
TT0070 # 09 Y:2011 09 2011 DEVELOP A REPAIR/REPLACE POLICY $5,985 $1,347 Not Implemented