IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

349

matching recommendations
Reset
SIC 3535 Conveyors And Conveying Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0220 # 04 Y:1999 04 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $40,406 $8,165 Implemented
UL0220 # 05 Y:1999 05 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $18,655 $1,448 Not Implemented
UL0220 # 06 Y:1999 06 1999 MOVE PRODUCT USING MECHANICAL MEANS $22,338 $5,000 Implemented
ME0242 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,934 $2,500 Implemented
ME0242 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,602 $11,858 Implemented
ME0242 # 03 Y:1998 03 1998 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,513 $8,600 Implemented
ME0242 # 04 Y:1998 04 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,383 $0 Implemented
ME0242 # 05 Y:1998 05 1998 USE OPTIMUM THICKNESS INSULATION $1,126 $1,700 Implemented
ME0242 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $591 $2,260 Implemented
ME0242 # 07 Y:1998 07 1998 USE OPTIMUM THICKNESS INSULATION $392 $90 Not Implemented
ME0242 # 08 Y:1998 08 1998 USE OPTIMUM THICKNESS INSULATION $90 $160 Implemented
ME0242 # 09 Y:1998 09 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,922 $3,036 Implemented
UM0110 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $1,394 $624 Implemented
UM0110 # 05 Y:1998 05 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,480 $1,000 Implemented
UM0110 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $301 $800 Not Implemented
UM0110 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $900 $50 n/a
UM0110 # 02 Y:1998 02 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,055 $11,155 Not Implemented
UM0110 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $929 $100 Implemented
UL0182 # 05 Y:1997 05 1997 INSTALL BACK-UP EQUIPMENT $23,221 $8,900 Not Implemented
UL0182 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,187 $20 Not Implemented
UL0182 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $15,253 $24,173 Not Implemented
UL0182 # 03 Y:1997 03 1997 CONVERT TO AQUEOUS CLEANING SYSTEM $8,500 $12,200 Not Implemented
UL0182 # 04 Y:1997 04 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $23,221 $9,100 Not Implemented
KU0473 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $3,480 Implemented
KU0473 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $280 $850 Not Implemented