IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

304

matching recommendations
Reset
SIC 3537 Industrial Trucks And Tractors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0214 # 11 Y:2002 11 2002 $38,952 $153,600 Not Implemented
MS0214 # 10 Y:2002 10 2002 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $6,462 $6,610 Not Implemented
MS0214 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $26,748 $7,400 Implemented
MS0214 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,371 $11,500 Implemented
MS0214 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,766 $288 Implemented
MS0214 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $3,765 $3,400 Not Implemented
MS0214 # 05 Y:2002 05 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $2,288 $270 Implemented
MS0214 # 06 Y:2002 06 2002 DISCONNECT BALLASTS $1,230 $1,395 Implemented
MS0214 # 07 Y:2002 07 2002 INSTALL TIMERS AND/OR THERMOSTATS $1,517 $1,416 Not Implemented
MS0214 # 08 Y:2002 08 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $582 $0 Implemented
MS0214 # 09 Y:2002 09 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $557 $200 Implemented
UM0216 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,100 $500 Not Implemented
UM0216 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,496 $7,269 Not Implemented
UM0216 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $222 $620 Not Implemented
UM0216 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,000 $2,000 Not Implemented
UM0216 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,873 $1,125 Not Implemented
UM0216 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,056 $500 Not Implemented
IC0033 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,405 $97,350 Implemented
IC0033 # 08 Y:2002 08 2002 ELIMINATE A BY-PRODUCT $6,316 $72,000 Not Implemented
IC0033 # 07 Y:2002 07 2002 USE PLASTIC PALLETS INSTEAD OF WOOD $10,750 $22,000 Implemented
IC0033 # 06 Y:2002 06 2002 $43,200 $8,500 Not Implemented
IC0033 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,179 $15,000 Not Implemented
IC0033 # 05 Y:2002 05 2002 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $13,369 $27,400 Not Implemented
IC0033 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,622 $5,604 Implemented
IC0033 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,219 $1,700 Implemented