Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
331
matching recommendationsSIC | 3537 | Industrial Trucks And Tractors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0343 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,859 | $9,696 | Not Implemented |
IA0343 # 07 Y:2004 | 07 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $39,733 | $10,000 | Implemented |
MS0214 # 01 Y:2002 | 01 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $26,748 | $7,400 | Implemented |
MS0214 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,371 | $11,500 | Implemented |
MS0214 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,766 | $288 | Implemented |
MS0214 # 04 Y:2002 | 04 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $3,765 | $3,400 | Not Implemented |
MS0214 # 05 Y:2002 | 05 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,288 | $270 | Implemented |
MS0214 # 06 Y:2002 | 06 | 2002 | DISCONNECT BALLASTS | $1,230 | $1,395 | Implemented |
MS0214 # 07 Y:2002 | 07 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $1,517 | $1,416 | Not Implemented |
MS0214 # 08 Y:2002 | 08 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $582 | $0 | Implemented |
MS0214 # 09 Y:2002 | 09 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $557 | $200 | Implemented |
MS0214 # 10 Y:2002 | 10 | 2002 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $6,462 | $6,610 | Not Implemented |
MS0214 # 11 Y:2002 | 11 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $38,952 | $153,600 | Not Implemented |
UM0216 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,873 | $1,125 | Not Implemented |
UM0216 # 02 Y:2002 | 02 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,100 | $500 | Not Implemented |
UM0216 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,056 | $500 | Not Implemented |
UM0216 # 04 Y:2002 | 04 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,000 | $2,000 | Not Implemented |
UM0216 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $222 | $620 | Not Implemented |
UM0216 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,496 | $7,269 | Not Implemented |
IC0033 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,405 | $97,350 | Implemented |
IC0033 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,622 | $5,604 | Implemented |
IC0033 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,219 | $1,700 | Implemented |
IC0033 # 04 Y:2002 | 04 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,179 | $15,000 | Not Implemented |
IC0033 # 05 Y:2002 | 05 | 2002 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $13,369 | $27,400 | Not Implemented |
IC0033 # 06 Y:2002 | 06 | 2002 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $43,200 | $8,500 | Not Implemented |