Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

928

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0199 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,352 $210 Implemented
NC0199 # 06 Y:2000 06 2000 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,140 $0 Implemented
DS0169 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,062 $246 Implemented
DS0169 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $2,943 Implemented
DS0169 # 05 Y:2000 05 2000 BURN WASTE OIL FOR HEAT $5,018 $1,695 Implemented
DS0169 # 07 Y:2000 07 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,694 $4,083 Implemented
DS0169 # 08 Y:2000 08 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $5,929 $12,962 Implemented
DS0169 # 09 Y:2000 09 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $600 $1,288 Implemented
SD0251 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,040 $200 Implemented
SD0251 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,438 $1,438 Implemented
SD0251 # 08 Y:2000 08 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,240 $7,900 Implemented
OK0594 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,935 $800 Implemented
OK0594 # 02 Y:2000 02 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,177 $13,490 Implemented
OK0594 # 03 Y:2000 03 2000 INSTALL SKYLIGHTS $3,419 $2,000 Implemented
OK0594 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $3,339 $860 Implemented
ME0281 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,461 $50 Implemented
ME0281 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,277 $300 Implemented
ME0281 # 05 Y:2000 05 2000 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $80,452 $92,000 Implemented
MO0271 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,238 $9,332 Implemented
MO0271 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,506 $175 Implemented
CO0450 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,800 $15,000 Implemented
UM0150 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $300 Implemented
BD0137 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,635 $225 Implemented
BD0137 # 09 Y:1999 09 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,707 $10,000 Implemented
DS0136 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $1,047 $1,960 Implemented