Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0648 # 04 Y:2009 | 04 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $36,798 | $150,000 | Implemented |
MA0648 # 07 Y:2009 | 07 | 2009 | COVER OPEN TANKS | $5,857 | $1,924 | Implemented |
MA0583 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $79 | $318 | Implemented |
MA0583 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $105 | $296 | Implemented |
MA0583 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $228 | $0 | Implemented |
MA0583 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $826 | $0 | Implemented |
MA0583 # 04 Y:2005 | 04 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,148 | $0 | Implemented |
MA0583 # 03 Y:2005 | 03 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,215 | $0 | Implemented |
MA0583 # 02 Y:2005 | 02 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,360 | $1,180 | Implemented |
MA0583 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,565 | $29,567 | Implemented |
MA0587 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $392 | $900 | Implemented |
MA0587 # 03 Y:2005 | 03 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $875 | $1,210 | Implemented |
MA0587 # 02 Y:2005 | 02 | 2005 | COMBINE UTILITY METERS | $4,300 | $15,675 | Implemented |
MA0320 # 03 Y:1994 | 03 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,381 | $700 | Implemented |
MA0295 # 03 Y:1994 | 03 | 1994 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,077 | $475 | Implemented |
MA0295 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,966 | $50 | Implemented |
MA0223 # 08 Y:1991 | 08 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $169 | $100 | Implemented |
MA0223 # 06 Y:1991 | 06 | 1991 | AIR CONDITION ONLY SPACE NECESSARY | $968 | $100 | Implemented |
MA0223 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $399 | $11,600 | Implemented |
MA0223 # 02 Y:1991 | 02 | 1991 | INSTALL SET-BACK TIMERS | $2,810 | $220 | Implemented |
MA0223 # 01 Y:1991 | 01 | 1991 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,884 | $1,100 | Implemented |
MA0207 # 01 Y:1991 | 01 | 1991 | USE RADIANT HEATER FOR SPOT HEATING | $9,335 | $20,000 | Implemented |
MA0207 # 05 Y:1991 | 05 | 1991 | OPTIMIZE PLANT POWER FACTOR | $2,718 | $4,000 | Implemented |
MA0207 # 04 Y:1991 | 04 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,202 | $0 | Implemented |
MA0207 # 03 Y:1991 | 03 | 1991 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $5,388 | $2,800 | Implemented |