Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,933
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0623 # 01 Y:2001 | 01 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $32,488 | $128,084 | Not Implemented |
UD0623 # 02 Y:2001 | 02 | 2001 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $13,412 | $700 | Implemented |
UD0623 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $12,127 | $196 | Implemented |
UD0623 # 04 Y:2001 | 04 | 2001 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $3,421 | $11,978 | Not Implemented |
UD0623 # 05 Y:2001 | 05 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,301 | $1,000 | Not Implemented |
UD0623 # 06 Y:2001 | 06 | 2001 | MINIMIZE WATER USAGE | $1,740 | $22 | Implemented |
UD0623 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,534 | $1,619 | Implemented |
UD0623 # 08 Y:2001 | 08 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $756 | $3,000 | Implemented |
UD0623 # 09 Y:2001 | 09 | 2001 | INSTALL TIMERS AND/OR THERMOSTATS | $675 | $225 | Not Implemented |
UD0623 # 10 Y:2001 | 10 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $641 | $436 | Not Implemented |
UD0622 # 01 Y:2001 | 01 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $12,500 | $2,500 | Implemented |
UD0622 # 02 Y:2001 | 02 | 2001 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $9,526 | $3,323 | Not Implemented |
UD0622 # 03 Y:2001 | 03 | 2001 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $5,610 | $3,200 | Not Implemented |
UD0622 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,574 | $6,830 | Implemented |
UD0622 # 05 Y:2001 | 05 | 2001 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,978 | $9,800 | Not Implemented |
UD0622 # 06 Y:2001 | 06 | 2001 | INSTALL SKYLIGHTS | $1,341 | $4,455 | Not Implemented |
UD0622 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $67 | $170 | Implemented |
LM0008 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,518 | $500 | Implemented |
LM0008 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,725 | $15,270 | Not Implemented |
LM0008 # 03 Y:2001 | 03 | 2001 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $787 | $0 | Implemented |
LM0008 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,758 | $1,463 | Not Implemented |
LM0008 # 05 Y:2001 | 05 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $36,000 | $27,600 | Implemented |
LM0008 # 06 Y:2001 | 06 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $146,432 | $17,000 | Implemented |
LM0008 # 07 Y:2001 | 07 | 2001 | HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | $332,648 | $0 | Implemented |
SF0212 # 01 Y:2001 | 01 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $847 | $1,513 | Implemented |