IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0307 # 01 Y:2021 01 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,351 $1,250 Not Implemented
MZ0307 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,100 $6,233 Implemented
MZ0307 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $809 $1,130 Implemented
OK0645 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,346 $2,900 Not Implemented
OK0645 # 03 Y:2002 03 2002 MODIFY WORKLOAD $10,443 $5,600 Not Implemented
OK0645 # 04 Y:2002 04 2002 MOVE PRODUCT USING MECHANICAL MEANS $22,600 $10,000 Not Implemented
OK0645 # 06 Y:2002 06 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $61,280 $44,000 Implemented
OK0645 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $176 $163 Implemented
OK0645 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,887 $220 Implemented
KU0515 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $530 $0 Implemented
KU0515 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,660 $2,430 Not Implemented
KU0515 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $400,000 $602,110 Implemented
KU0515 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $820 $2,540 Not Implemented
KU0515 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,780 $400 Implemented
KU0515 # 05 Y:1999 05 1999 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $3,140 $7,830 Implemented
KU0454 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $778 $1,140 Implemented
KU0454 # 10 Y:1995 10 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $157 $176 Implemented
KU0454 # 09 Y:1995 09 1995 RECOVER WASTE HEAT FROM EQUIPMENT $831 $865 Implemented
KU0454 # 08 Y:1995 08 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $737 $333 Not Implemented
KU0454 # 07 Y:1995 07 1995 USE PHOTOCELL CONTROLS $548 $120 Implemented
KU0454 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $2,037 $1,750 Not Implemented
KU0454 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,851 $5,940 Not Implemented
KU0454 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,625 $8,741 Implemented
KU0454 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $8,681 $10,200 Implemented
KU0454 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,987 $18,760 Implemented