IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

102

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0176 # 05 Y:1999 05 1999 USE LESS WASTEFUL PACKAGING $2,479 $1,300 Not Implemented
AR0176 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $946 $2,237 Not Implemented
AR0176 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30 $287 Not Implemented
AR0176 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,964 $17,500 Not Implemented
AR0176 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,051 $360 Not Implemented
AR0176 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $659 $1,135 Not Implemented
CO0450 # 03 Y:1999 03 1999 PURCHASE APPROPRIATELY SIZED MATERIAL $1,580 $0 Not Implemented
CO0450 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,800 $15,000 Implemented
CO0450 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,280 $60,960 Not Implemented
UM0150 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,828 $1,500 Not Implemented
UM0150 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $300 Implemented
UM0150 # 03 Y:1999 03 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,067 $880 Not Implemented
UM0150 # 05 Y:1999 05 1999 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $35,216 $50,000 Not Implemented
UM0150 # 04 Y:1999 04 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,923 $1,750 Not Implemented
IA0226 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,279 $0 Not Implemented
IA0226 # 05 Y:1999 05 1999 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $2,575 $2,704 Not Implemented
IA0226 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $54,760 $210,137 Not Implemented
IA0226 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $103 $50 Not Implemented
IA0226 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $224 $865 Not Implemented
IA0226 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $760 $0 Not Implemented
BD0137 # 09 Y:1999 09 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,707 $10,000 Implemented
BD0137 # 08 Y:1999 08 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $662 $380 Not Implemented
BD0137 # 11 Y:1999 11 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $11,480 $45,000 Not Implemented
BD0137 # 05 Y:1999 05 1999 USE SYNTHETIC LUBRICANT $1,173 $600 Not Implemented
BD0137 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $793 $1,540 Not Implemented