Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 354 | Metalworking Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0420 # 01 Y:2009 | 01 | 2009 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $685 | $0 | Implemented |
SD0420 # 02 Y:2009 | 02 | 2009 | INSTALL OCCUPANCY SENSORS | $383 | $246 | Not Implemented |
SD0420 # 03 Y:2009 | 03 | 2009 | USE PHOTOCELL CONTROLS | $3,350 | $4,950 | Not Implemented |
SD0420 # 04 Y:2009 | 04 | 2009 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,037 | $3,000 | Not Implemented |
SD0420 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,131 | $3,573 | Not Implemented |
MZ0038 # 02 Y:2009 | 02 | 2009 | INSTALL OCCUPANCY SENSORS | $408 | $178 | Not Implemented |
MZ0038 # 03 Y:2009 | 03 | 2009 | INSTALL OCCUPANCY SENSORS | $600 | $178 | Implemented |
MZ0038 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $840 | $850 | Implemented |
MZ0038 # 05 Y:2009 | 05 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,110 | $4,200 | Not Implemented |
MZ0038 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,616 | $2,740 | Implemented |
MA0648 # 01 Y:2009 | 01 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $30,103 | $31,813 | Not Implemented |
MA0648 # 02 Y:2009 | 02 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $54,137 | $59,160 | Not Implemented |
MA0648 # 04 Y:2009 | 04 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $36,798 | $150,000 | Implemented |
MA0648 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,937 | $15,375 | Not Implemented |
MA0648 # 07 Y:2009 | 07 | 2009 | COVER OPEN TANKS | $5,857 | $1,924 | Implemented |
MA0648 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $36,052 | $6,000 | Not Implemented |
MA0648 # 03 Y:2009 | 03 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $36,829 | $50,000 | Not Implemented |
UM0351 # 06 Y:2009 | 06 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,506 | $1,660 | Not Implemented |
UM0351 # 05 Y:2009 | 05 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,656 | $500 | Implemented |
UM0351 # 04 Y:2009 | 04 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,124 | $2,800 | Not Implemented |
UM0351 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,516 | $100 | Not Implemented |
UM0351 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,706 | $19,921 | Implemented |
UM0351 # 01 Y:2009 | 01 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $37,050 | $0 | Implemented |
SU0279 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $204 | $305 | Implemented |
SU0279 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,866 | $10,242 | Implemented |