IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 354 Metalworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0420 # 01 Y:2009 01 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $685 $0 Implemented
SD0420 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $383 $246 Not Implemented
SD0420 # 03 Y:2009 03 2009 USE PHOTOCELL CONTROLS $3,350 $4,950 Not Implemented
SD0420 # 04 Y:2009 04 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,037 $3,000 Not Implemented
SD0420 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,131 $3,573 Not Implemented
MZ0038 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $408 $178 Not Implemented
MZ0038 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $600 $178 Implemented
MZ0038 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $850 Implemented
MZ0038 # 05 Y:2009 05 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,110 $4,200 Not Implemented
MZ0038 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,616 $2,740 Implemented
MA0648 # 01 Y:2009 01 2009 RECOVER WASTE HEAT FROM EQUIPMENT $30,103 $31,813 Not Implemented
MA0648 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $54,137 $59,160 Not Implemented
MA0648 # 04 Y:2009 04 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $36,798 $150,000 Implemented
MA0648 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,937 $15,375 Not Implemented
MA0648 # 07 Y:2009 07 2009 COVER OPEN TANKS $5,857 $1,924 Implemented
MA0648 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,052 $6,000 Not Implemented
MA0648 # 03 Y:2009 03 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,829 $50,000 Not Implemented
UM0351 # 06 Y:2009 06 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,506 $1,660 Not Implemented
UM0351 # 05 Y:2009 05 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,656 $500 Implemented
UM0351 # 04 Y:2009 04 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,124 $2,800 Not Implemented
UM0351 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,516 $100 Not Implemented
UM0351 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,706 $19,921 Implemented
UM0351 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $37,050 $0 Implemented
SU0279 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $204 $305 Implemented
SU0279 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,866 $10,242 Implemented