IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

125

matching recommendations
Reset
SIC 3541 Machine Tools, Metal Cutting Types
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0157 # 10 Y:1996 10 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,200 $1,000 Implemented
UM0043 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,000 $40 Implemented
ME0167 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,675 $600 Implemented
ME0167 # 03 Y:1995 03 1995 PAY UTILITY BILLS ON TIME $890 $0 Implemented
KU0454 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,987 $18,760 Implemented
KU0454 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $8,681 $10,200 Implemented
KU0454 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,625 $8,741 Implemented
KU0454 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $778 $1,140 Implemented
KU0454 # 07 Y:1995 07 1995 USE PHOTOCELL CONTROLS $548 $120 Implemented
KU0454 # 09 Y:1995 09 1995 RECOVER WASTE HEAT FROM EQUIPMENT $831 $865 Implemented
KU0454 # 10 Y:1995 10 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $157 $176 Implemented
MA0329 # 02 Y:1995 02 1995 PAY UTILITY BILLS ON TIME $6,219 $0 Implemented
MA0329 # 03 Y:1995 03 1995 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,088 $1,950 Implemented
MA0329 # 04 Y:1995 04 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,392 $0 Implemented
MA0329 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,663 $9,216 Implemented
MA0329 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,356 $1,200 Implemented
MA0329 # 07 Y:1995 07 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,306 $0 Implemented
MA0329 # 08 Y:1995 08 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,463 $300 Implemented
MA0329 # 09 Y:1995 09 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $343 $333 Implemented
UD0431 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $20,078 $28,500 Implemented
UD0431 # 02 Y:1994 02 1994 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $18,567 $2,000 Implemented
UD0431 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,395 $2,500 Implemented
UD0431 # 05 Y:1994 05 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $53,070 $50,000 Implemented
DS0002 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,387 $5,687 Implemented
DS0002 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $731 $130 Implemented