Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
123
matching recommendationsSIC | 3542 | Machine Tools, Metal Forming Types |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0093 # 08 Y:2017 | 08 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,674 | $2,715 | Implemented |
IP0093 # 10 Y:2017 | 10 | 2017 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $12,141 | $13,384 | Implemented |
IC0198 # 02 Y:2017 | 02 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,956 | $0 | Implemented |
UD0960 # 01 Y:2017 | 01 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,202 | $0 | Implemented |
UD0960 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,808 | $0 | Implemented |
UD0960 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,390 | $1,000 | Implemented |
UD0960 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $17,273 | $0 | Implemented |
UD0960 # 06 Y:2017 | 06 | 2017 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $514 | $1,425 | Implemented |
UD0960 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,385 | $0 | Implemented |
SU0402 # 07 Y:2015 | 07 | 2015 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $770 | $950 | Implemented |
SU0402 # 10 Y:2015 | 10 | 2015 | UPGRADE OBSOLETE EQUIPMENT | $7,911 | $23,244 | Implemented |
SU0402 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,073 | $600 | Implemented |
SU0402 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $431 | $560 | Implemented |
SU0402 # 08 Y:2015 | 08 | 2015 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $1,495 | $2,000 | Implemented |
SU0402 # 05 Y:2015 | 05 | 2015 | REDUCE VENTILATION AIR | $8,182 | $2,941 | Implemented |
UM0460 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,160 | $1,100 | Implemented |
UM0460 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,526 | $161,000 | Implemented |
UM0460 # 05 Y:2015 | 05 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,072 | $4,000 | Implemented |
BS0051 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $396 | $1,280 | Implemented |
BS0051 # 03 Y:2015 | 03 | 2015 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $638 | $259 | Implemented |
BS0051 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,969 | $3,393 | Implemented |
WV0427 # 06 Y:2011 | 06 | 2011 | SHADE WINDOWS FROM SUMMER SUN | $5,176 | $81,597 | Implemented |
WV0427 # 05 Y:2011 | 05 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,786 | $1,000 | Implemented |
WV0427 # 09 Y:2011 | 09 | 2011 | MODIFY STARTUP/SHUTDOWN TIMES | $3,115 | $975 | Implemented |
WV0427 # 04 Y:2011 | 04 | 2011 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $6,867 | $637 | Implemented |