Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 3542 | Machine Tools, Metal Forming Types |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0960 # 06 Y:2017 | 06 | 2017 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $514 | $1,425 | Implemented |
UD0960 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $17,273 | $0 | Implemented |
UD0960 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,390 | $1,000 | Implemented |
UD0960 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,808 | $0 | Implemented |
UD0960 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,385 | $0 | Implemented |
UD0960 # 01 Y:2017 | 01 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,202 | $0 | Implemented |
WV0427 # 10 Y:2011 | 10 | 2011 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,890 | $258 | Implemented |
WV0427 # 09 Y:2011 | 09 | 2011 | MODIFY STARTUP/SHUTDOWN TIMES | $3,115 | $975 | Implemented |
WV0427 # 06 Y:2011 | 06 | 2011 | SHADE WINDOWS FROM SUMMER SUN | $5,176 | $81,597 | Implemented |
WV0427 # 05 Y:2011 | 05 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,786 | $1,000 | Implemented |
WV0427 # 04 Y:2011 | 04 | 2011 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $6,867 | $637 | Implemented |
UD0733 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,735 | $0 | Implemented |
UD0733 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $512 | $2,200 | Implemented |
UD0733 # 05 Y:2006 | 05 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $5,125 | $0 | Implemented |
UD0733 # 04 Y:2006 | 04 | 2006 | RECOVER AND REUSE WASTE MATERIAL | $8,505 | $5,000 | Implemented |
UD0733 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,688 | $59,616 | Implemented |
UD0733 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,973 | $29,659 | Implemented |
UD0733 # 01 Y:2006 | 01 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $252,912 | $3,750 | Implemented |
UD0623 # 08 Y:2001 | 08 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $756 | $3,000 | Implemented |
UD0623 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,534 | $1,619 | Implemented |
UD0623 # 06 Y:2001 | 06 | 2001 | MINIMIZE WATER USAGE | $1,740 | $22 | Implemented |
UD0623 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $12,127 | $196 | Implemented |
UD0623 # 02 Y:2001 | 02 | 2001 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $13,412 | $700 | Implemented |
UD0235 # 01 Y:1987 | 01 | 1987 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,496 | $500 | Implemented |
UD0235 # 02 Y:1987 | 02 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,497 | $0 | Implemented |