Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
55
matching recommendationsSIC | 3542 | Machine Tools, Metal Forming Types |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0982 # 13 Y:2018 | 13 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $13,372 | $10,000 | Implemented |
UD0982 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,415 | $0 | Implemented |
UD0982 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,010 | $500 | Implemented |
UD0982 # 02 Y:2018 | 02 | 2018 | REDUCE VENTILATION AIR | $9,420 | $3,000 | Implemented |
UD0982 # 01 Y:2018 | 01 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,886 | $0 | Implemented |
UD0982 # 05 Y:2018 | 05 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,501 | $8,000 | Implemented |
UD0982 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,208 | $3,500 | Implemented |
UD0982 # 08 Y:2018 | 08 | 2018 | COVER OPEN TANKS | $700 | $460 | Not Implemented |
UD0982 # 09 Y:2018 | 09 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,311 | $113,386 | Not Implemented |
UD0982 # 10 Y:2018 | 10 | 2018 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,443 | $0 | Implemented |
UD0982 # 11 Y:2018 | 11 | 2018 | INSTALL OCCUPANCY SENSORS | $5,167 | $1,500 | Implemented |
UD0982 # 12 Y:2018 | 12 | 2018 | ADD AREA LIGHTING SWITCHES | $675 | $500 | Implemented |
UD0982 # 07 Y:2018 | 07 | 2018 | COVER OPEN TANKS | $268 | $0 | Not Implemented |
UM0465 # 05 Y:2016 | 05 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,361 | $150 | Not Implemented |
UM0465 # 04 Y:2016 | 04 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,573 | $0 | Not Implemented |
UM0465 # 01 Y:2016 | 01 | 2016 | INSTALL OCCUPANCY SENSORS | $3,158 | $5,250 | Not Implemented |
UM0465 # 02 Y:2016 | 02 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,640 | $2,000 | Not Implemented |
UM0465 # 03 Y:2016 | 03 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $485 | $1,029 | Not Implemented |
UM0460 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,160 | $1,100 | Implemented |
UM0460 # 05 Y:2015 | 05 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,072 | $4,000 | Implemented |
UM0460 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $305 | $1,000 | Not Implemented |
UM0460 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,482 | $3,500 | Not Implemented |
UM0460 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,526 | $161,000 | Implemented |
UM0351 # 06 Y:2009 | 06 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,506 | $1,660 | Not Implemented |
UM0351 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,516 | $100 | Not Implemented |