IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 3544 Special Dies, Tools, Jigs & Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0364 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,885 $5,500 Implemented
UM0364 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $913 $2,000 Implemented
UM0364 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $1,498 $1,464 Not Implemented
UM0364 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,618 $7,917 Implemented
UM0364 # 01 Y:2010 01 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,260 $8,716 Not Implemented
UM0293 # 06 Y:2005 06 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $227 $200 Implemented
UM0293 # 05 Y:2005 05 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,239 $0 Not Implemented
UM0293 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $3,999 $2,728 Not Implemented
UM0293 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,085 $50 Implemented
UM0293 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,506 $175 Implemented
UM0293 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,861 $18,165 Implemented
UM0279 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,890 $500 Implemented
UM0279 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,190 $2,000 Implemented
UM0279 # 03 Y:2005 03 2005 UPGRADE CONTROLS ON COMPRESSORS $3,802 $9,000 Not Implemented
UM0279 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,805 $750 Implemented
UM0279 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,916 $17,993 Not Implemented
UM0089 # 05 Y:1997 05 1997 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,931 $6,343 Not Implemented
UM0089 # 04 Y:1997 04 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $224 $0 Not Implemented
UM0089 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $1,588 $1,000 Not Implemented
UM0089 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,465 $25,326 Not Implemented
UM0089 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $881 $1,000 Not Implemented
UM0074 # 06 Y:1996 06 1996 USE A RAG RECYCLE SERVICE $12,282 $4,095 Not Implemented
UM0074 # 05 Y:1996 05 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,905 $30,800 Implemented
UM0074 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $3,903 $4,000 Not Implemented
UM0074 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,899 $16,317 Implemented