IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
SIC 3544 Special Dies, Tools, Jigs & Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0160 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $142 $0 Implemented
WV0160 # 06 Y:1999 06 1999 RECOVER WASTE HEAT FROM EQUIPMENT $830 $130 Implemented
WV0160 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $333 $214 Not Implemented
WV0160 # 08 Y:1999 08 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,624 $16,640 Not Implemented
WV0160 # 09 Y:1999 09 1999 USE OTHER WASTE CONCENTRATION METHODS $4,680 $140 Not Implemented
WV0160 # 10 Y:1999 10 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $776 $5,000 Not Implemented
WV0160 # 11 Y:1999 11 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $68 $0 Not Implemented
WV0160 # 12 Y:1999 12 1999 $180,000 $11,000 Implemented
UD0549 # 01 Y:1998 01 1998 $322,350 $250,000 Not Implemented
UD0549 # 02 Y:1998 02 1998 $12,682 $0 Implemented
UD0549 # 03 Y:1998 03 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $3,343 $1,000 Not Implemented
UD0549 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,070 $3,903 Not Implemented
UD0549 # 05 Y:1998 05 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $736 $0 Implemented
UD0549 # 06 Y:1998 06 1998 RECOVER WASTE HEAT FROM EQUIPMENT $624 $500 Implemented
UD0549 # 07 Y:1998 07 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $204 $250 Not Implemented
UD0548 # 01 Y:1998 01 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $2,243 $0 Implemented
UD0548 # 02 Y:1998 02 1998 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $7,607 $720 Implemented
UD0548 # 03 Y:1998 03 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,274 $300 Not Implemented
UD0548 # 04 Y:1998 04 1998 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,375 $1,120 Implemented
UD0548 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $781 $2,000 Not Implemented
WV0095 # 01 Y:1996 01 1996 USE POWER DURING OFF-PEAK PERIODS $24,235 $0 Implemented
WV0095 # 02 Y:1996 02 1996 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,565 $550 Implemented
WV0095 # 03 Y:1996 03 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $466 $700 Implemented
WV0095 # 04 Y:1996 04 1996 DIRECT WARMEST AIR TO COMBUSTION INTAKE $534 $2,105 Not Implemented
WV0095 # 05 Y:1996 05 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $1,811 $2,743 Implemented