IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

424

matching recommendations
Reset
SIC 3545 Machine Tool Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0746 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,070 $2,100 Implemented
MA0746 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,299 $3,000 Implemented
MA0746 # 06 Y:2015 06 2015 REPAIR OR REPLACE STEAM TRAPS $2,323 $362 Implemented
MA0746 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,874 $2,960 Implemented
BD0439 # 01 Y:2013 01 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,296 $50 Implemented
BD0439 # 02 Y:2013 02 2013 USE RADIANT HEATER FOR SPOT HEATING $4,775 $6,000 Not Implemented
BD0439 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,900 $1,000 Implemented
BD0439 # 04 Y:2013 04 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,797 $3,310 Not Implemented
BD0439 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $813 $795 Implemented
BD0439 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $535 $395 Not Implemented
BD0439 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $400 $20 Implemented
BD0439 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $341 $350 Implemented
BD0439 # 09 Y:2013 09 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $293 $300 Not Implemented
AM0608 # 01 Y:2012 01 2012 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,383,679 $251,064 Implemented
AM0608 # 02 Y:2012 02 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $90,500 $180,000 Not Implemented
AM0608 # 03 Y:2012 03 2012 RECOVER AND REUSE WASTE MATERIAL $144,150 $85,000 Implemented
AM0608 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,200 $124,000 Implemented
AM0608 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $12,691 $3,566 Not Implemented
AM0608 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,360 $65 Not Implemented
AM0608 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,900 $1,625 Implemented
AM0605 # 10 Y:2012 10 2012 PAY UTILITY BILLS ON TIME $345 $0 Not Implemented
AM0605 # 09 Y:2012 09 2012 INSTALL OCCUPANCY SENSORS $545 $130 Implemented
AM0605 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,940 $105 Not Implemented
AM0605 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $1,700 Implemented
AM0605 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,400 $4,500 Not Implemented