IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 3546 Power-driven Handtools
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0371 # 05 Y:2014 05 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,925 $846 Implemented
SU0371 # 01 Y:2014 01 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,498 $0 Implemented
SU0371 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,974 $15,880 Implemented
SU0371 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $335 Implemented
SU0371 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,627 $979 Implemented
OK0805 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $98,548 $15,600 Implemented
OK0805 # 01 Y:2011 01 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $165,120 $3,385 Implemented
NC0398 # 01 Y:2010 01 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $35,525 $20,000 Implemented
NC0398 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $93,642 $225,498 Implemented
NC0398 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,554 $1,205 Implemented
NC0398 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,697 $200 Implemented
AM0407 # 05 Y:2002 05 2002 REUSE RAGS UNTIL COMPLETELY SOILED $180 $0 Implemented
AM0407 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $190 $0 Implemented
AM0407 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,330 $300 Implemented
NC0199 # 06 Y:2000 06 2000 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,140 $0 Implemented
NC0199 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,352 $210 Implemented
NC0199 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,374 $7,490 Implemented
UM0150 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $300 Implemented
NC0144 # 06 Y:1998 06 1998 METER WASTE WATER $1,464 $200 Implemented
NC0144 # 05 Y:1998 05 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $113 $200 Implemented
NC0144 # 04 Y:1998 04 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,617 $4,731 Implemented
NC0144 # 02 Y:1998 02 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,664 $1,000 Implemented
NC0144 # 07 Y:1998 07 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $5,550 $2,700 Implemented
WI0311 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,492 $7,504 Implemented
MA0380 # 04 Y:1996 04 1996 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $616 $885 Implemented