IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 355 Special Industry Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0897 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,796 $2,066 Implemented
OK0897 # 07 Y:2014 07 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,545 $3,641 Implemented
OK0897 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,000 $10,067 Implemented
OK0897 # 01 Y:2014 01 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,056 $0 Implemented
OK0897 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,792 $1,656 Implemented
OK0897 # 04 Y:2014 04 2014 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $248 $0 Implemented
OK0897 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,440 $1,188 Implemented
AR0197 # 02 Y:2000 02 2000 DISCONNECT BALLASTS $6,341 $2,605 Not Implemented
AR0197 # 08 Y:2000 08 2000 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $80,371 $16,150 Not Implemented
AR0197 # 07 Y:2000 07 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $7,335 $500 Not Implemented
AR0197 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,153 $120 Not Implemented
AR0197 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,334 $6,713 Not Implemented
AR0197 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $101 $1,780 Not Implemented
AR0197 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $26 $0 Not Implemented
AR0197 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,457 $2,178 Not Implemented
AR0153 # 04 Y:1998 04 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $14,173 $1,565 Not Implemented
AR0153 # 02 Y:1998 02 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $674 $0 Implemented
AR0153 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $245 $913 Implemented
AR0153 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $764 $540 Not Implemented
AR0153 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,917 $0 Implemented
AR0153 # 06 Y:1998 06 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,493 $1,000 Implemented
AR0153 # 07 Y:1998 07 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $63,905 $16,750 Implemented
AR0153 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $106,508 $25,000 Implemented
AR0111 # 06 Y:1997 06 1997 OPTIMIZE PLANT POWER FACTOR $6,121 $4,140 Implemented
AR0111 # 05 Y:1997 05 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,779 $330 Implemented