Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 355 | Special Industry Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2317 # 09 Y:2023 | 09 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $30,659 | $188,853 | Not Implemented |
UC2317 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $90,350 | $29,189 | Not Implemented |
UC2317 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $392 | $75 | Not Implemented |
UC2317 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,123 | $428 | Not Implemented |
UC2317 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,584 | $1,300 | Not Implemented |
UC2317 # 12 Y:2023 | 12 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,411 | $0 | Not Implemented |
UC2317 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,240 | $50 | Not Implemented |
UC2317 # 06 Y:2023 | 06 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $714 | $540 | Not Implemented |
UC2317 # 10 Y:2023 | 10 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $6,903 | $1,468 | Not Implemented |
UC2317 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,763 | $17,190 | Not Implemented |
UC2317 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $321,413 | $2,701,940 | Not Implemented |
UC2317 # 08 Y:2023 | 08 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,409 | $34,609 | Not Implemented |
CM1025 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,196 | $889 | n/a |
CM1025 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $2,954 | $22,704 | n/a |
CM1025 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,162 | $2,172 | n/a |
CM1025 # 02 Y:2023 | 02 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,141 | $28,827 | n/a |
CM1025 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,270 | $526,058 | n/a |
LS2316 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,726 | $4,515 | Implemented |
LS2316 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $460 | $753 | Implemented |
LS2316 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,296 | $25,200 | Not Implemented |
LS2316 # 04 Y:2023 | 04 | 2023 | USE PHOTOCELL CONTROLS | $1,069 | $370 | Not Implemented |
LS2316 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,894 | $135 | Implemented |
LS2316 # 01 Y:2023 | 01 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $3,030 | $30 | Not Implemented |
CM1024 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $760 | $75 | n/a |
CM1024 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,939 | $6,474 | n/a |