IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

117

matching recommendations
Reset
SIC 3555 Printing Trades Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0833 # 01 Y:2011 01 2011 INSTALL OCCUPANCY SENSORS $2,272 $300 Implemented
UD0833 # 03 Y:2011 03 2011 UPGRADE CONTROLS ON COMPRESSORS $24,064 $1,075 Not Implemented
UD0833 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,467 $25 Implemented
UD0833 # 11 Y:2011 11 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $83,814 $10,000 Not Implemented
NC0389 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $627 $0 Not Implemented
NC0389 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $100 Implemented
NC0389 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,172 $4,300 Not Implemented
NC0389 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,752 $54,282 Not Implemented
NC0389 # 05 Y:2009 05 2009 DEVELOP A REPAIR/REPLACE POLICY $571 $892 Implemented
MI0096 # 07 Y:2004 07 2004 COVER OPEN TANKS $34 $25 Implemented
MI0096 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $110 $56 Implemented
MI0096 # 05 Y:2004 05 2004 USE SYNTHETIC LUBRICANT $696 $189 Not Implemented
MI0096 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $-147 $1,015 Not Implemented
MI0096 # 03 Y:2004 03 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,619 $150 Implemented
MI0096 # 02 Y:2004 02 2004 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $3,213 $1,250 Implemented
MI0096 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $6,113 $800 Not Implemented
CO0526 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $586 Not Implemented
CO0526 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $980 $3,300 Implemented
CO0526 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,398 $6,640 Not Implemented
CO0526 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,060 $580 Not Implemented
CO0526 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,602 $5,670 Implemented
CO0526 # 04 Y:2003 04 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $8,180 $3,150 Implemented
CO0526 # 03 Y:2003 03 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $8,350 $1,640 Not Implemented
CO0526 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,240 $33,710 Implemented
CO0526 # 01 Y:2003 01 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $21,790 $37,580 Implemented