IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
Reset
SIC 3556 Food Products Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0286 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,970 $2,000 Implemented
MZ0286 # 02 Y:2020 02 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,624 $9,088 Implemented
LS1909 # 03 Y:2019 03 2019 REPAIR AND ELIMINATE STEAM LEAKS $2,121 $585 Implemented
LS1909 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,322 $1,222 Implemented
CL1805 # 01 Y:2018 01 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $50,691 $506,862 Implemented
CL1805 # 02 Y:2018 02 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,183 $13,011 Implemented
BD0457 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,919 $8,320 Implemented
BD0457 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,863 $567 Implemented
UD0900 # 08 Y:2014 08 2014 RECOVER WASTE HEAT FROM EQUIPMENT $565 $2,500 Implemented
UD0900 # 03 Y:2014 03 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $540 $1,500 Implemented
UD0900 # 01 Y:2014 01 2014 REDUCE VENTILATION AIR $27,790 $9,213 Implemented
UD0900 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $566 $0 Implemented
UD0879 # 04 Y:2013 04 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,298 $27,662 Implemented
UD0879 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $357 $1,000 Implemented
UD0879 # 08 Y:2013 08 2013 REDUCE VENTILATION AIR $7,088 $900 Implemented
UD0879 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $418 $0 Implemented
UD0879 # 07 Y:2013 07 2013 USE MINIMUM STEAM OPERATING PRESSURE $281 $0 Implemented
UD0879 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $307 $0 Implemented
SF0418 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,408 $0 Implemented
SF0418 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,301 $8,388 Implemented
SF0418 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $40,533 $0 Implemented
SF0418 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,230 $15,467 Implemented
TT0061 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,100 $4,800 Implemented
TT0061 # 02 Y:2011 02 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $195 $0 Implemented
TT0061 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $513 $1,200 Implemented