Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
105
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0265 # 02 Y:2022 | 02 | 2022 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $705 | $304 | Implemented |
IC0265 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,567 | $5,100 | Implemented |
IC0265 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,312 | $7,533 | Implemented |
BD0491 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,994 | $20 | Implemented |
BD0491 # 03 Y:2016 | 03 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,307 | $7,500 | Implemented |
BD0491 # 01 Y:2016 | 01 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,795 | $6,550 | Implemented |
BD0491 # 09 Y:2016 | 09 | 2016 | INSTALL OCCUPANCY SENSORS | $778 | $600 | Implemented |
BD0491 # 07 Y:2016 | 07 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,131 | $2,800 | Implemented |
BD0491 # 06 Y:2016 | 06 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,427 | $1,000 | Implemented |
BD0491 # 05 Y:2016 | 05 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,456 | $2,700 | Implemented |
BD0491 # 11 Y:2016 | 11 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $209 | $190 | Implemented |
MZ0115 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,874 | $204,750 | Implemented |
MZ0115 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,543 | $1,160 | Implemented |
MZ0115 # 09 Y:2013 | 09 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,362 | $1,500 | Implemented |
MZ0115 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,027 | $1,600 | Implemented |
MZ0115 # 04 Y:2013 | 04 | 2013 | ELIMINATE/REDUCE AN OPERATION | $11,784 | $0 | Implemented |
MZ0115 # 10 Y:2013 | 10 | 2013 | CONDENSE OPERATION INTO ONE BUILDING | $99,466 | $35,000 | Implemented |
BD0400 # 03 Y:2011 | 03 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $12,072 | $12,600 | Implemented |
BD0400 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,389 | $20 | Implemented |
BD0400 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,217 | $1,600 | Implemented |
BD0400 # 06 Y:2011 | 06 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,214 | $10,450 | Implemented |
BD0400 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,602 | $2,039 | Implemented |
BD0400 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $2,250 | $1,058 | Implemented |
BD0254 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,675 | $700 | Implemented |
BD0254 # 03 Y:2004 | 03 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,567 | $521 | Implemented |