IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0265 # 02 Y:2022 02 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $705 $304 Implemented
IC0265 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,567 $5,100 Implemented
IC0265 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,312 $7,533 Implemented
BD0491 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,994 $20 Implemented
BD0491 # 03 Y:2016 03 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,307 $7,500 Implemented
BD0491 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,795 $6,550 Implemented
BD0491 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $778 $600 Implemented
BD0491 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,131 $2,800 Implemented
BD0491 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,427 $1,000 Implemented
BD0491 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,456 $2,700 Implemented
BD0491 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $209 $190 Implemented
MZ0115 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,874 $204,750 Implemented
MZ0115 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,543 $1,160 Implemented
MZ0115 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,362 $1,500 Implemented
MZ0115 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,027 $1,600 Implemented
MZ0115 # 04 Y:2013 04 2013 ELIMINATE/REDUCE AN OPERATION $11,784 $0 Implemented
MZ0115 # 10 Y:2013 10 2013 CONDENSE OPERATION INTO ONE BUILDING $99,466 $35,000 Implemented
BD0400 # 03 Y:2011 03 2011 USE RADIANT HEATER FOR SPOT HEATING $12,072 $12,600 Implemented
BD0400 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,389 $20 Implemented
BD0400 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,217 $1,600 Implemented
BD0400 # 06 Y:2011 06 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,214 $10,450 Implemented
BD0400 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,602 $2,039 Implemented
BD0400 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $2,250 $1,058 Implemented
BD0254 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,675 $700 Implemented
BD0254 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,567 $521 Implemented