IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

190

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0816 # 07 Y:2011 07 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,005 $315,900 Not Implemented
OK0816 # 01 Y:2011 01 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $20,409 $71,773 Not Implemented
OK0816 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $1,488 Implemented
OK0816 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $391 $456 Implemented
OK0816 # 04 Y:2011 04 2011 DISCONNECT BALLASTS $481 $921 Not Implemented
OK0816 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $17,462 $0 Not Implemented
OK0816 # 06 Y:2011 06 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $13,197 $9,150 Not Implemented
OK0812 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $6,323 $26,111 Implemented
OK0812 # 05 Y:2011 05 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $13,390 $7,255 Not Implemented
OK0812 # 06 Y:2011 06 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $12,936 $21,477 Not Implemented
OK0812 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,301 $7,605 Not Implemented
OK0812 # 08 Y:2011 08 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,925 $14,300 Implemented
OK0812 # 09 Y:2011 09 2011 INSTALL TIMERS AND/OR THERMOSTATS $801 $353 Implemented
OK0812 # 10 Y:2011 10 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,148 $7,130 Not Implemented
OK0812 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,843 $750 Implemented
OK0812 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $34,390 $92,072 Implemented
OK0812 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $11,401 $77,770 Not Implemented
OK0743 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $5,413 $723 Implemented
OK0743 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $21,613 $2,450 Implemented
OK0743 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $22,720 $5,010 Implemented
OK0743 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,189 $569 Implemented
OK0743 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,598 $3,500 Implemented
OK0743 # 03 Y:2007 03 2007 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $642 $6,000 Implemented
OK0743 # 06 Y:2007 06 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $24,607 $0 Not Implemented
OK0593 # 06 Y:2000 06 2000 USE LOW VOC OR WATER BASED PAINT $1,315 $1,350 Implemented