IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0168 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $240 Implemented
LL0168 # 08 Y:2003 08 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,146 $1,157 Implemented
IA0320 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,539 $449 Implemented
IA0320 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,376 $457 Not Implemented
IA0320 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,892 $25 Not Implemented
IA0320 # 04 Y:2003 04 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,565 $7,100 Not Implemented
IA0320 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $520 $888 Implemented
IA0320 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,629 $3,694 Not Implemented
IA0320 # 07 Y:2003 07 2003 USE OPTIMUM THICKNESS INSULATION $2,436 $2,132 Not Implemented
IA0320 # 08 Y:2003 08 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,500 $0 Implemented
IA0320 # 09 Y:2003 09 2003 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $4,550 $2,800 Not Implemented
AS0349 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $758 $975 Implemented
AS0349 # 02 Y:2003 02 2003 INSTALL SKYLIGHTS $15,856 $33,200 n/a
AS0349 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $6,729 $9,784 n/a
AS0349 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,062 $56 Implemented
AS0349 # 05 Y:2003 05 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,556 $1,316 Implemented
AS0349 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,435 $5,084 Implemented
AS0349 # 07 Y:2003 07 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,638 $7,500 Implemented
AS0349 # 08 Y:2003 08 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $878,532 $1,880,000 n/a
AS0349 # 09 Y:2003 09 2003 MINIMIZE WATER USAGE $3,515 $0 Implemented
AS0349 # 10 Y:2003 10 2003 MINIMIZE WATER USAGE $138 $60 Implemented
AS0349 # 11 Y:2003 11 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $603,884 $11,220 Not Implemented
UU0037 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,120 $0 Not Implemented
UU0037 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $675 $420 Not Implemented
UU0037 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $1,896 $2,861 Not Implemented