IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0022 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24 $24 Implemented
MU0022 # 05 Y:2022 05 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $62 $71 Not Implemented
MU0022 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $76 $71 Implemented
MU0022 # 07 Y:2022 07 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,775 $1,183 Not Implemented
MU0022 # 08 Y:2022 08 2022 ELIMINATE SHIFT $23,894 $0 Not Implemented
UW2212 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,231 $0 Implemented
UW2212 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $405 $0 Implemented
UW2212 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $160 Not Implemented
MA0845 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $108,785 $906,122 Not Implemented
MA0845 # 02 Y:2022 02 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $26,668 $60,000 Implemented
MA0845 # 03 Y:2022 03 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,709 $182,139 Not Implemented
MA0845 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,754 $14,292 Implemented
MA0845 # 05 Y:2022 05 2022 ADJUST VENTS TO MINIMIZE ENERGY USE $8,349 $10,667 Not Implemented
MA0845 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $6,066 $2,910 Not Implemented
MA0845 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,762 $505 Not Implemented
UC2201 # 01 Y:2022 01 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,041 $56,085 Implemented
UC2201 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,440 $15,982 Not Implemented
UC2201 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,036 $48,285 Implemented
UC2201 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,728 $2,000 Implemented
UC2201 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,009 $4,000 Not Implemented
UC2201 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,185 $200 Not Implemented
UC2201 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $158,531 $626,592 Not Implemented
UC2201 # 08 Y:2022 08 2022 PAY UTILITY BILLS ON TIME $530 $0 Implemented
UC2201 # 09 Y:2022 09 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,563 $0 Implemented
AM0850 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $10,860 $17,420 Implemented