IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0252 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,134 $4,647 Not Implemented
MO0252 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,315 $53 Not Implemented
MO0252 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,006 $40 Not Implemented
MO0252 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,877 $4,372 Implemented
MO0252 # 08 Y:1999 08 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,674 $3,340 Implemented
WV0163 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,038 $30 Not Implemented
WV0163 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,261 $132 Implemented
WV0163 # 03 Y:1999 03 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,997 $1,290 Implemented
WV0163 # 04 Y:1999 04 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $4,974 $6,400 Not Implemented
WV0163 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $3,844 $390 Implemented
WV0163 # 06 Y:1999 06 1999 RECOVER WASTE HEAT FROM EQUIPMENT $947 $616 Not Implemented
WV0163 # 07 Y:1999 07 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $740 $420 Not Implemented
WV0163 # 08 Y:1999 08 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,619 $3,500 Not Implemented
WV0163 # 09 Y:1999 09 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $1,854 $1,075 Implemented
WV0163 # 10 Y:1999 10 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $49,719 $11,000 Implemented
WV0163 # 11 Y:1999 11 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $22,950 $0 Implemented
DS0130 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,448 $7,644 Not Implemented
DS0130 # 02 Y:1999 02 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $988 $750 Not Implemented
DS0130 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $3,384 $2,175 Not Implemented
DS0130 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,845 $100 Implemented
DS0130 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,359 $300 Implemented
DS0130 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $2,683 $756 Not Implemented
DS0130 # 07 Y:1999 07 1999 REPLACE CLOTH RAGS WITH PAPER TOWELS $42,908 $3,800 Implemented
DS0130 # 08 Y:1999 08 1999 UPGRADE OBSOLETE EQUIPMENT $1,750 $1,000 Implemented
DS0130 # 09 Y:1999 09 1999 UPGRADE OBSOLETE EQUIPMENT $8,400 $55,000 Implemented