IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1073 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,707 $1,176 Implemented
OK1073 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,161 $9,927 Implemented
OK1073 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,129 $0 Implemented
KU0476 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $180 $270 Implemented
KU0476 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,010 $230 Implemented
KU0476 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,360 $5,470 Implemented
KU0476 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,340 $0 Implemented
KU0476 # 11 Y:1997 11 1997 $7,620 $0 Implemented
KU0476 # 10 Y:1997 10 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,340 $300 Implemented
OK0360 # 01 Y:1991 01 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,269 $135 Implemented
OK0360 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,965 $0 Implemented
OK0360 # 03 Y:1991 03 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,917 $1,000 Implemented
KU0242 # 04 Y:1988 04 1988 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,965 $3,600 Implemented
KU0242 # 11 Y:1988 11 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $107 $0 Implemented
KU0242 # 10 Y:1988 10 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $500 Implemented
KU0242 # 08 Y:1988 08 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $928 $0 Implemented
KU0242 # 07 Y:1988 07 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,236 $1,500 Implemented
KU0242 # 06 Y:1988 06 1988 INSTALL AUTOMATIC STACK DAMPER $1,519 $1,800 Implemented
KU0242 # 02 Y:1988 02 1988 REDESIGN PROCESS $4,705 $2,080 Implemented
KU0242 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,183 $6,000 Implemented
KU0144 # 10 Y:1984 10 1984 RECOVER WASTE HEAT FROM EQUIPMENT $753 $400 Implemented
KU0144 # 09 Y:1984 09 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,039 $500 Implemented
KU0144 # 08 Y:1984 08 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $160 $0 Implemented
KU0144 # 07 Y:1984 07 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,279 $39 Implemented
KU0144 # 05 Y:1984 05 1984 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,578 $0 Implemented