IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1009 # 07 Y:2019 07 2019 INSTALL TIMERS AND/OR THERMOSTATS $8,182 $1,430 Implemented
OK1009 # 04 Y:2019 04 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $7,915 $0 Implemented
OK1009 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,469 $833 Implemented
OK0878 # 12 Y:2014 12 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,570 $55,638 Implemented
OK0878 # 05 Y:2014 05 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $229 $525 Implemented
OK0878 # 10 Y:2014 10 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,228 $37,188 Implemented
OK0878 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,371 $13,908 Implemented
OK0878 # 07 Y:2014 07 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,821 $2,573 Implemented
OK0878 # 04 Y:2014 04 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,905 $262 Implemented
OK0878 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,554 $1,400 Implemented
OK0878 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,459 $5,148 Implemented
OK0859 # 14 Y:2013 14 2013 REDUCE HEAT GAIN BY WINDOW TINTING $372 $0 Implemented
OK0859 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,187 $7,856 Implemented
OK0859 # 13 Y:2013 13 2013 REDUCE HEAT GAIN BY WINDOW TINTING $3,200 $6,500 Implemented
OK0859 # 10 Y:2013 10 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,170 $30,000 Implemented
OK0859 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,550 $3,000 Implemented
OK0817 # 10 Y:2011 10 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,371 $0 Implemented
OK0817 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,011 $23,400 Implemented
OK0817 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,438 $510 Implemented
OK0816 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,037 $0 Implemented
OK0816 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $391 $456 Implemented
OK0816 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $1,488 Implemented
OK0816 # 11 Y:2011 11 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,760 $1,338 Implemented
OK0816 # 08 Y:2011 08 2011 REPLACE BOILER $26,135 $24,220 Implemented
OK0812 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $34,390 $92,072 Implemented