IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 3561 Pumps And Pumping Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0859 # 14 Y:2013 14 2013 REDUCE HEAT GAIN BY WINDOW TINTING $372 $0 Implemented
OK0859 # 13 Y:2013 13 2013 REDUCE HEAT GAIN BY WINDOW TINTING $3,200 $6,500 Implemented
OK0859 # 10 Y:2013 10 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,170 $30,000 Implemented
OK0859 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,550 $3,000 Implemented
OK0859 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,187 $7,856 Implemented
OK0812 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,843 $750 Implemented
OK0812 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $34,390 $92,072 Implemented
OK0812 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $6,323 $26,111 Implemented
OK0812 # 08 Y:2011 08 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,925 $14,300 Implemented
OK0812 # 09 Y:2011 09 2011 INSTALL TIMERS AND/OR THERMOSTATS $801 $353 Implemented
OK0520 # 08 Y:1997 08 1997 SCHEDULE DELIVERIES ACCORDING TO DEMAND $18,000 $0 Implemented
OK0520 # 06 Y:1997 06 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $312 $58 Implemented
OK0520 # 05 Y:1997 05 1997 INSTALL SET-BACK TIMERS $657 $0 Implemented
OK0520 # 02 Y:1997 02 1997 RECOVER AND REUSE WASTE MATERIAL $10,940 $0 Implemented
OK0520 # 01 Y:1997 01 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $16,641 $12,000 Implemented
OK0438 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $32 $92 Implemented
OK0438 # 01 Y:1994 01 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,195 $1,030 Implemented
OK0195 # 07 Y:1986 07 1986 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $2,030 $1,200 Implemented
OK0195 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $582 $0 Implemented
OK0195 # 05 Y:1986 05 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,289 $1,200 Implemented
OK0195 # 04 Y:1986 04 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,902 $0 Implemented
OK0195 # 03 Y:1986 03 1986 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,520 $3,000 Implemented
OK0195 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,989 $500 Implemented
OK0174 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $5,711 $1,000 Implemented
OK0174 # 01 Y:1985 01 1985 OPTIMIZE PLANT POWER FACTOR $980 $2,872 Implemented