IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

617

matching recommendations
Reset
SIC 3561 Pumps And Pumping Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0346 # 04 Y:1999 04 1999 UPGRADE CONTROLS ON COMPRESSORS $3,664 $1,430 Not Implemented
OR0346 # 05 Y:1999 05 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,077 $24,750 Not Implemented
WV0170 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,495 $265 Not Implemented
WV0170 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $847 $180 Not Implemented
WV0170 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,864 $600 Implemented
WV0170 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,084 $98 Implemented
WV0170 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,095 $4,400 Not Implemented
WV0170 # 06 Y:1999 06 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,114 $300 Implemented
WV0170 # 07 Y:1999 07 1999 INSULATE BARE EQUIPMENT $486 $450 Not Implemented
WV0170 # 08 Y:1999 08 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $750 $40 Not Implemented
WV0170 # 09 Y:1999 09 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,644 $11,000 Not Implemented
WV0170 # 10 Y:1999 10 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $576 $42 Implemented
WV0170 # 11 Y:1999 11 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $16,640 $720 Not Implemented
WV0170 # 12 Y:1999 12 1999 APPLY FOR INVESTMENT INCENTIVES $21,376 $0 Implemented
TN0660 # 01 Y:1999 01 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $56,525 $880 Implemented
TN0660 # 02 Y:1999 02 1999 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $20,100 $50,000 Implemented
TN0660 # 03 Y:1999 03 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,247 $4,700 Implemented
TN0660 # 04 Y:1999 04 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,450 $0 Not Implemented
TN0660 # 05 Y:1999 05 1999 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,360 $1,070 Implemented
TN0660 # 06 Y:1999 06 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,300 $8,200 Implemented
KU0510 # 01 Y:1998 01 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,740 $200 Implemented
KU0510 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,400 $4,710 Implemented
KU0510 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,670 $900 Implemented
KU0510 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $350 $1,000 Implemented
KU0510 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $400 Implemented