Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 3561 | Pumps And Pumping Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0859 # 14 Y:2013 | 14 | 2013 | REDUCE HEAT GAIN BY WINDOW TINTING | $372 | $0 | Implemented |
OK0859 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,187 | $7,856 | Implemented |
OK0859 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,550 | $3,000 | Implemented |
OK0859 # 10 Y:2013 | 10 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $17,170 | $30,000 | Implemented |
OK0859 # 13 Y:2013 | 13 | 2013 | REDUCE HEAT GAIN BY WINDOW TINTING | $3,200 | $6,500 | Implemented |
OK0812 # 08 Y:2011 | 08 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,925 | $14,300 | Implemented |
OK0812 # 01 Y:2011 | 01 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $34,390 | $92,072 | Implemented |
OK0812 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,843 | $750 | Implemented |
OK0812 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $6,323 | $26,111 | Implemented |
OK0812 # 09 Y:2011 | 09 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $801 | $353 | Implemented |
OK0520 # 08 Y:1997 | 08 | 1997 | $18,000 | $0 | Implemented | |
OK0520 # 06 Y:1997 | 06 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $312 | $58 | Implemented |
OK0520 # 05 Y:1997 | 05 | 1997 | INSTALL SET-BACK TIMERS | $657 | $0 | Implemented |
OK0520 # 02 Y:1997 | 02 | 1997 | RECOVER AND REUSE WASTE MATERIAL | $10,940 | $0 | Implemented |
OK0520 # 01 Y:1997 | 01 | 1997 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $16,641 | $12,000 | Implemented |
OK0438 # 05 Y:1994 | 05 | 1994 | INSULATE BARE EQUIPMENT | $32 | $92 | Implemented |
OK0438 # 01 Y:1994 | 01 | 1994 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,195 | $1,030 | Implemented |
OK0195 # 07 Y:1986 | 07 | 1986 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $2,030 | $1,200 | Implemented |
OK0195 # 06 Y:1986 | 06 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $582 | $0 | Implemented |
OK0195 # 05 Y:1986 | 05 | 1986 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,289 | $1,200 | Implemented |
OK0195 # 04 Y:1986 | 04 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,902 | $0 | Implemented |
OK0195 # 03 Y:1986 | 03 | 1986 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $2,520 | $3,000 | Implemented |
OK0195 # 01 Y:1986 | 01 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,989 | $500 | Implemented |
OK0174 # 02 Y:1985 | 02 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $5,711 | $1,000 | Implemented |
OK0174 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,578 | $21,250 | Implemented |