Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
96
matching recommendationsSIC | 3563 | Air And Gas Compressors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1058 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,307 | $29,827 | Implemented |
UD1058 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $282 | $0 | Implemented |
UD1058 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,636 | $952 | Implemented |
CM1009 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $13,200 | $201,300 | Implemented |
MZ0321 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,760 | $11,000 | Implemented |
MZ0321 # 04 Y:2021 | 04 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $23,778 | $5,120 | Implemented |
MZ0321 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $46,936 | $63,900 | Implemented |
MZ0321 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,197 | $657 | Implemented |
UF0562 # 08 Y:2020 | 08 | 2020 | USE PHOTOCELL CONTROLS | $904 | $0 | Implemented |
UF0562 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $2,645 | $4,780 | Implemented |
UF0562 # 03 Y:2020 | 03 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,271 | $0 | Implemented |
UF0562 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,635 | $4,086 | Implemented |
UF0562 # 06 Y:2020 | 06 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,545 | $1,778 | Implemented |
GT0915 # 01 Y:2018 | 01 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,293 | $100 | Implemented |
GT0915 # 02 Y:2018 | 02 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,909 | $580 | Implemented |
GT0915 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,057 | $13,064 | Implemented |
MZ0115 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,874 | $204,750 | Implemented |
MZ0115 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,027 | $1,600 | Implemented |
MZ0115 # 04 Y:2013 | 04 | 2013 | ELIMINATE/REDUCE AN OPERATION | $11,784 | $0 | Implemented |
MZ0115 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,543 | $1,160 | Implemented |
MZ0115 # 09 Y:2013 | 09 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,362 | $1,500 | Implemented |
MZ0115 # 10 Y:2013 | 10 | 2013 | CONDENSE OPERATION INTO ONE BUILDING | $99,466 | $35,000 | Implemented |
TT0073 # 01 Y:2011 | 01 | 2011 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $13,566 | $9,650 | Implemented |
TT0054 # 06 Y:2010 | 06 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $410 | $50 | Implemented |
TT0054 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,240 | $4,000 | Implemented |