Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
328
matching recommendationsSIC | 3564 | Blowers And Fans |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0395 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $1,563 | $1,800 | Implemented |
WI0395 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $320 | $350 | Implemented |
WI0395 # 05 Y:2001 | 05 | 2001 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,257 | $6,000 | Implemented |
SD0266 # 08 Y:2001 | 08 | 2001 | INSTALL AUTOMATIC PACKING EQUIPMENT | $6,772 | $3,400 | Implemented |
WV0204 # 06 Y:2000 | 06 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,627 | $680 | Implemented |
WV0204 # 10 Y:2000 | 10 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $705 | $75 | Implemented |
WV0204 # 09 Y:2000 | 09 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,607 | $680 | Implemented |
WV0204 # 07 Y:2000 | 07 | 2000 | USE SYNTHETIC LUBRICANT | $656 | $334 | Implemented |
WV0204 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $12,395 | $2,180 | Implemented |
WV0204 # 04 Y:2000 | 04 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $658 | $1,088 | Implemented |
WV0204 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $503 | $40 | Implemented |
WV0204 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,068 | $17 | Implemented |
UL0228 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,001 | $20 | Implemented |
MS0138 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $187 | $197 | Implemented |
MS0138 # 02 Y:1999 | 02 | 1999 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $884 | $80 | Implemented |
MS0138 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,777 | $1,994 | Implemented |
MS0138 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,462 | $266 | Implemented |
MS0138 # 05 Y:1999 | 05 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,832 | $3,788 | Implemented |
MS0138 # 08 Y:1999 | 08 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $18,055 | $720 | Implemented |
NC0163 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $55,000 | $14,000 | Implemented |
NC0163 # 07 Y:1999 | 07 | 1999 | TREAT AND REUSE RINSE WATERS | $7,389 | $4,500 | Implemented |
NC0163 # 01 Y:1999 | 01 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $11,222 | $17,000 | Implemented |
NC0163 # 02 Y:1999 | 02 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,614 | $1,600 | Implemented |
NC0163 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,866 | $25 | Implemented |
NC0163 # 06 Y:1999 | 06 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,068 | $1,000 | Implemented |