Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3564 Blowers And Fans
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0366 # 10 Y:2007 10 2007 DEVELOP A REPAIR/REPLACE POLICY $2,440 $898 Implemented
WV0366 # 16 Y:2007 16 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $667 $282 Implemented
WV0366 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,252 $0 Implemented
WV0366 # 08 Y:2007 08 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,400 $1,050 Implemented
WV0366 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,696 $1,315 Implemented
WV0366 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,238 $5,148 Implemented
WV0366 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,342 $0 Implemented
WV0366 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,251 $20,735 Implemented
UD0674 # 02 Y:2003 02 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,166 $30,000 Implemented
UD0674 # 15 Y:2003 15 2003 DISCONNECT BALLASTS $313 $44 Implemented
UD0674 # 14 Y:2003 14 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $360 $100 Implemented
UD0674 # 12 Y:2003 12 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $481 $0 Implemented
UD0674 # 10 Y:2003 10 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $2,200 Implemented
UD0674 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $715 $0 Implemented
UD0559 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,288 $0 Implemented
UD0559 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,782 $500 Implemented
UD0559 # 05 Y:1998 05 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,469 $0 Implemented
UD0559 # 02 Y:1998 02 1998 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $13,770 $5,000 Implemented
UD0132 # 04 Y:1984 04 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $823 $0 Implemented
UD0132 # 03 Y:1984 03 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $698 $1,436 Implemented
UD0132 # 02 Y:1984 02 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,478 $500 Implemented
UD0125 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,474 $5,156 Implemented
UD0125 # 02 Y:1984 02 1984 COVER OPEN TANKS $1,611 $1,080 Implemented
UD0125 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,583 $11,079 Implemented
UD0124 # 01 Y:1984 01 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,949 $30,000 Implemented