IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 3564 Blowers And Fans
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0497 # 07 Y:2013 07 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,053 $513 Implemented
NC0497 # 08 Y:2013 08 2013 DEVELOP A REPAIR/REPLACE POLICY $3,513 $4,256 Implemented
NC0497 # 09 Y:2013 09 2013 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $360 $650 Implemented
NC0434 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,609 $32,453 Implemented
NC0434 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,138 $2,127 Implemented
NC0434 # 02 Y:2011 02 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,152 $14,895 Implemented
NC0434 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,424 $1,000 Implemented
NC0434 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $142 $100 Implemented
NC0434 # 05 Y:2011 05 2011 REPLACE BOILER $5,957 $26,400 Not Implemented
NC0434 # 09 Y:2011 09 2011 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $1,039 $876 Implemented
NC0434 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,087 $10,660 Implemented
NC0434 # 06 Y:2011 06 2011 COVER OPEN TANKS $414 $908 Implemented
NC0237 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,825 $500 Not Implemented
NC0237 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,935 $3,000 Not Implemented
NC0237 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,443 $680 Implemented
NC0237 # 01 Y:2002 01 2002 RECYCLE WHITE WATER $6,970 $3,500 Implemented
NC0163 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,614 $1,600 Implemented
NC0163 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $55,000 $14,000 Implemented
NC0163 # 07 Y:1999 07 1999 TREAT AND REUSE RINSE WATERS $7,389 $4,500 Implemented
NC0163 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,068 $1,000 Implemented
NC0163 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $19,985 $35,000 Not Implemented
NC0163 # 04 Y:1999 04 1999 COVER OPEN TANKS $24,515 $21,000 Not Implemented
NC0163 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,866 $25 Implemented
NC0163 # 01 Y:1999 01 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,222 $17,000 Implemented
OD0097 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,814 $7,298 n/a