Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
261
matching recommendationsSIC | 3566 | Speed Changers, Drives, And Gears |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0215 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,018 | $151 | Not Implemented |
MS0215 # 04 Y:2002 | 04 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $500 | $708 | Implemented |
IC0023 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,245 | $900 | n/a |
IC0023 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $272 | $150 | n/a |
IC0023 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,208 | $14,105 | n/a |
IC0023 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,187 | $14,750 | n/a |
IC0023 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $1,046 | $501 | n/a |
IC0023 # 06 Y:2001 | 06 | 2001 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $11,745 | $14,000 | n/a |
IC0023 # 07 Y:2001 | 07 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,070 | $2,812 | n/a |
IC0023 # 08 Y:2001 | 08 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $14,413 | $72,000 | n/a |
SU0111 # 01 Y:2001 | 01 | 2001 | PAY UTILITY BILLS ON TIME | $605 | $0 | Not Implemented |
SU0111 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $210 | $0 | Implemented |
SU0111 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $345 | $0 | Implemented |
SU0111 # 04 Y:2001 | 04 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,383 | $2,500 | Not Implemented |
SU0111 # 05 Y:2001 | 05 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,959 | $0 | Implemented |
SU0111 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $358 | $60 | Not Implemented |
SU0111 # 07 Y:2001 | 07 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $3,135 | $0 | Implemented |
IC0010 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,637 | $8,900 | Implemented |
IC0010 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,908 | $245 | Not Implemented |
IC0010 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $2,511 | $4,312 | Implemented |
IC0010 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,703 | $21,377 | n/a |
IC0010 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $552 | $1,250 | Implemented |
IC0010 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,700 | $178,925 | n/a |
IC0010 # 07 Y:2001 | 07 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $45,000 | $9,500 | Implemented |
IC0010 # 08 Y:2001 | 08 | 2001 | MODIFY WORKLOAD | $208,000 | $57,400 | n/a |