IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

261

matching recommendations
Reset
SIC 3566 Speed Changers, Drives, And Gears
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0215 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,018 $151 Not Implemented
MS0215 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $500 $708 Implemented
IC0023 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,245 $900 n/a
IC0023 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $272 $150 n/a
IC0023 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,208 $14,105 n/a
IC0023 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,187 $14,750 n/a
IC0023 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $1,046 $501 n/a
IC0023 # 06 Y:2001 06 2001 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $11,745 $14,000 n/a
IC0023 # 07 Y:2001 07 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,070 $2,812 n/a
IC0023 # 08 Y:2001 08 2001 RECOVER AND REUSE WASTE MATERIAL $14,413 $72,000 n/a
SU0111 # 01 Y:2001 01 2001 PAY UTILITY BILLS ON TIME $605 $0 Not Implemented
SU0111 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $210 $0 Implemented
SU0111 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $345 $0 Implemented
SU0111 # 04 Y:2001 04 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,383 $2,500 Not Implemented
SU0111 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $11,959 $0 Implemented
SU0111 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $358 $60 Not Implemented
SU0111 # 07 Y:2001 07 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,135 $0 Implemented
IC0010 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,637 $8,900 Implemented
IC0010 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,908 $245 Not Implemented
IC0010 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $2,511 $4,312 Implemented
IC0010 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,703 $21,377 n/a
IC0010 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $552 $1,250 Implemented
IC0010 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,700 $178,925 n/a
IC0010 # 07 Y:2001 07 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $45,000 $9,500 Implemented
IC0010 # 08 Y:2001 08 2001 MODIFY WORKLOAD $208,000 $57,400 n/a