Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
286
matching recommendationsSIC | 3568 | Power Transmission Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0845 # 05 Y:2022 | 05 | 2022 | ADJUST VENTS TO MINIMIZE ENERGY USE | $8,349 | $10,667 | Not Implemented |
MA0845 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,754 | $14,292 | Implemented |
MA0845 # 03 Y:2022 | 03 | 2022 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,709 | $182,139 | Not Implemented |
MA0845 # 07 Y:2022 | 07 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,762 | $505 | Not Implemented |
MA0845 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $6,066 | $2,910 | Not Implemented |
MA0845 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $108,785 | $906,122 | Not Implemented |
MA0845 # 02 Y:2022 | 02 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $26,668 | $60,000 | Implemented |
IC0265 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,567 | $5,100 | Implemented |
IC0265 # 04 Y:2022 | 04 | 2022 | ELIMINATE COMBUSTIBLE GAS IN FLUE GAS | $19,650 | $2,435 | Not Implemented |
IC0265 # 02 Y:2022 | 02 | 2022 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $705 | $304 | Implemented |
IC0265 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,312 | $7,533 | Implemented |
OK1073 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $32,771 | $39,489 | Not Implemented |
OK1073 # 05 Y:2022 | 05 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,129 | $0 | Implemented |
OK1073 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,707 | $1,176 | Implemented |
OK1073 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,548 | $12,334 | Not Implemented |
OK1073 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,161 | $9,927 | Implemented |
IC0246 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,458 | $4,300 | Not Implemented |
IC0246 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $433 | $214 | Not Implemented |
IC0246 # 03 Y:2021 | 03 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20,948 | $40,000 | Not Implemented |
IC0246 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,527 | $1,200 | Not Implemented |
IC0246 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,840 | $544 | Not Implemented |
SU0498 # 03 Y:2020 | 03 | 2020 | ELIMINATE/REDUCE AN OPERATION | $22,525 | $4,900 | Not Implemented |
SU0498 # 01 Y:2020 | 01 | 2020 | REDUCE VENTILATION AIR | $6,925 | $882 | Not Implemented |
SU0498 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $325 | $60 | Not Implemented |
SU0498 # 04 Y:2020 | 04 | 2020 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $346 | $85 | Not Implemented |