IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

286

matching recommendations
Reset
SIC 3568 Power Transmission Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0845 # 05 Y:2022 05 2022 ADJUST VENTS TO MINIMIZE ENERGY USE $8,349 $10,667 Not Implemented
MA0845 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,754 $14,292 Implemented
MA0845 # 03 Y:2022 03 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,709 $182,139 Not Implemented
MA0845 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,762 $505 Not Implemented
MA0845 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $6,066 $2,910 Not Implemented
MA0845 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $108,785 $906,122 Not Implemented
MA0845 # 02 Y:2022 02 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $26,668 $60,000 Implemented
IC0265 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,567 $5,100 Implemented
IC0265 # 04 Y:2022 04 2022 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $19,650 $2,435 Not Implemented
IC0265 # 02 Y:2022 02 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $705 $304 Implemented
IC0265 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,312 $7,533 Implemented
OK1073 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $32,771 $39,489 Not Implemented
OK1073 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,129 $0 Implemented
OK1073 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,707 $1,176 Implemented
OK1073 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,548 $12,334 Not Implemented
OK1073 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,161 $9,927 Implemented
IC0246 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,458 $4,300 Not Implemented
IC0246 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $433 $214 Not Implemented
IC0246 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $20,948 $40,000 Not Implemented
IC0246 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,527 $1,200 Not Implemented
IC0246 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,840 $544 Not Implemented
SU0498 # 03 Y:2020 03 2020 ELIMINATE/REDUCE AN OPERATION $22,525 $4,900 Not Implemented
SU0498 # 01 Y:2020 01 2020 REDUCE VENTILATION AIR $6,925 $882 Not Implemented
SU0498 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $325 $60 Not Implemented
SU0498 # 04 Y:2020 04 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $346 $85 Not Implemented